A M O B UK Bodmin Road, Coventry, CV2 5DB Data via plota.co.uk

PL/2026/0001941/FUL - FUL minor application Pending Consideration

Proposal

Proposed remodelling of existing parking area/forecourt. Proposed 2 metre high automatic sliding vehicle gate and pedestrian gate. Proposed installation of 2 metre high brick boundary walls and close boarded fencing with associated landscaping and drainage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 29 Dec 2026, from Coventry's recent extensions.

Site constraints 6

Air quality management area: Coventry City-Wide AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 807 m away: A46 Coventry Junctions (Walsgrave)
The site is 807 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Scheduled monument 180 m away: Caludon Castle: a moated site and part of an associated water management system; Radon affected area, class 3; Coalfield, development low risk area; Inside the Coventry built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 13 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Coventry - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Coventry
Application type
FUL minor application
Postcode
CV2 5DB
Received
9 Nov 2026
Validated
9 Nov 2026
Ward
Wyken
Case officer
Show
Target decision
4 Jan 2027
Decision level
Delegated decision
Applicant
Show
Agent
M & J Planning Ltd

Decision outlook

Day 14 of the 56-day target. Coventry usually decides extensions by day 50.

Day 1442 days to the 56-day target
94%decided within 8 weeks
84%approved
905decided in the last year

Plota live figures for extensions decided by Coventry in the last twelve months, from validation. Coventry decision record →

Consultation & key dates

Statutory expiry
4 Jan 2027
Coventry
Planning Authority Score
7.7/10
Good
#35 of 296 overall
Relevant to this application:
Householder decisions

Coventry is one of the fastest councils in England for householder decisions: #13 of 296 on speed. Only 13% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Coventry decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #219 of 296
90%
Householder approved
Above avg (90%) #189 of 296
91%
Decided in 8 weeks
Above avg (63%) #13 of 296
13%
Extended time limit
Below avg (41%) #7 of 296
72%
Minor dwellings approved
114 decided (1-9 homes)
89%
Major dwellings approved
28 decided (10+ homes)
74%
Change of use approved
100 decided
1,131
Total decisions
186 refused in the year to March 2026