Development Site Land North And West Of Holborough Quarry Ladds Lane Snodland Kent Data via plota.co.uk

26/01508/HRSC - Habitat Regulations screening request Awaiting decision

Proposal

Request for Screening Opinion under the Habitats and Species Regulations 2017 in respect of: Mixed-use development of 1,300 homes and supporting services and infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
✓
Consultation
17 Aug 2026
Decision
Expected by 7 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 23 Oct 2026, from Tonbridge's recent new homes.

The consultation period closed on 7 Sept 2026.

Site constraints 8

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Special area of conservation 487 m away: North Downs Woodlands; SSSI 487 m away: Halling to Trottiscliffe Escarpment SSSI; National landscape 478 m away: Kent Downs; Priority habitat 25 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tonbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tonbridge
Application type
Habitat Regulations screening request
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
Snodland West And Holborough Lakes
Parish
Snodland
Target decision
7 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
David Lock Associates

Decision outlook

Day 58 of the 56-day target. Tonbridge usually decides new homes by day 65.

Day 587 days to the predicted decision (day 65)
34%decided within 8 weeks
68%approved
66decided in the last year

Plota live figures for new homes decided by Tonbridge in the last twelve months, from validation. Tonbridge decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
17 Aug 2026
Comments by
7 Sept 2026
Statutory expiry
7 Oct 2026
Env. assessment
No
Tonbridge
Planning Authority Score
4/10
Below average
#193 of 296 councils
Relevant to this application:
Major dwellings

Tonbridge is slower than most councils at deciding householder applications, ranking #244 out of 296. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tonbridge decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #31 of 296
97%
Householder approved
Above avg (90%) #45 of 296
49%
Decided in 8 weeks
Below avg (63%) #244 of 296
54%
Extended time limit
Above avg (41%) #246 of 296
88%
Minor dwellings approved
96 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
89%
Change of use approved
9 decided
880
Total decisions
47 refused in the year to March 2026