Land to the North of Mereoak Park And Ride Mereoak Lane, Three Mile Cross Wokingham, Data via plota.co.uk

Proposal

Full application for the proposed change of use to provide an open storage facility (Use Class B8), including access, levelled storage areas and associated infrastructure, following demolition of existing building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2026
✓
Validated
22 Oct 2026
Decision
Expected by 17 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 16 Dec 2026 and 3 Jan 2027, from Wokingham's recent changes of use.

Comments are open until 26 Nov 2026

Comment on this application ↗

Site constraints 3

National infrastructure project: M4 Junctions 3 to 12 Smart Motorway
The site is inside the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Reading). Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
Inside the Three Mile Cross built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wokingham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wokingham
Received
21 Oct 2026
Validated
22 Oct 2026
Ward
Spencers Wood & Swallowfield
Parish
Shinfield
Applicant
Show

Decision outlook

Day 27 of the 56-day target. Wokingham usually decides changes of use by day 58.

Day 2731 days to the predicted decision (day 58)
47%decided within 8 weeks
71%approved
57decided in the last year

Plota live figures for changes of use decided by Wokingham in the last twelve months, from validation. Wokingham decision record →

Consultation & key dates

Planning Portal ref
PP/15303298
Consultation
27 Oct 2026
Comments by
26 Nov 2026
Site or press notice
5 Nov 2026
Statutory expiry
21 Jan 2027
Wokingham
Planning Authority Score
6.7/10
Good
#73 of 296 councils
Relevant to this application:
Change of use

Wokingham ranks #111 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Wokingham decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #48 of 296
96%
Householder approved
Above avg (90%) #66 of 296
72%
Decided in 8 weeks
Above avg (63%) #111 of 296
36%
Extended time limit
Below avg (41%) #116 of 296
84%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
26 decided (10+ homes)
91%
Change of use approved
43 decided
1,142
Total decisions
64 refused in the year to March 2026