TESCO Southgate Market Weighton East Riding Of Yorkshire YO43 3BG Data via plota.co.uk

25/01870/STVAR - Strategic - Variation of Condition(s) Approved

Proposal

Variation of Condition 19 (deliveries) on planning permission to allow deliveries between 07:00-22:00 Monday-Saturday and 09:00-20:00 on Sundays Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jul 2025
✓
Consultation
20 Oct 2025
✓
Approved
20 Oct 2025

Approved on 20 Oct 2025 · Special Delegated · Last checked 14 Oct 2026

Site constraints 5

National infrastructure project 1 km away: Yorkshire and Humber CCS Cross Country Pipeline
The site is 1 km from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Conservation area 23 m away: Market Weighton
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Radon affected area, class 4; 1 listed building within 150 m; Inside the Market Weighton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area3,079 m² (33,142 sq ft)
Energy ratingB (asset rating 49)
UseRetail/Financial and Professional Services
HeatingAir Conditioning

From the energy performance certificate lodged in July 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Strategic - Variation of Condition(s)
Postcode
YO43 3BG
Received
1 Jul 2025
Validated
1 Jul 2025
Ward
Wolds Weighton
Parish
Market Weighton Town Council
Case officer
Show
Target decision
20 Oct 2025
Decision
Approve
Decision date
20 Oct 2025
Decision level
Special Delegated
Applicant
Show
Agent
Redline Planning Services Ltd

Public comments

2comments received
2 objecting

2 neighbours consulted · Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14137730
Planning Portal ref
PP-14137730
Neighbours
20 Oct 2025
Consultation
20 Oct 2025
Comments by
24 Aug 2025
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 overall
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions: #7 of 296 on speed. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.