Land At Titchfield Lane Wickham Hampshire Data via plota.co.uk

24/02804/FUL - Full Application Approved

Proposal

Installation, operation and decommissioning of renewable energy generating station comprising ground-mounted photovoltaic solar arrays together with transformer stations, site accesses, internal access tracks, security measures, access gates, other ancillary infrastructure, landscaping and biodiversity enhancements. temporary permission for 40 years. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Dec 2024
✓
Validated
3 Feb 2025
✓
Approved
25 Sept 2025

Approved on 25 Sept 2025 · Committee Decision · Last checked 12 Nov 2026

Planning committee

Decided by Winchester Planning Committee on 24 Sept 2025.

Approved

As officers recommended.

  • Officers advised approval because the renewable energy and biodiversity benefits outweighed landscape, heritage and National Park harm.
  • Parish councils, residents and a ward member raised concerns about landscape, farmland, traffic, construction, cumulative effects and community benefits.
  • The committee voted to grant permission, with amendments requiring infrastructure removal and a construction phasing plan.
Read how the committee decided The proposed solar farm, site history, officer assessment, objections, public speakers, committee debate, vote and decision. Includes the meeting recording, from 0:02:31 where this application was taken

Source: Plota analysis of Winchester's committee minutes of 24 Sept 2025.

Documents 193

Statements & assessments 32

PDF TREE SURVEY PLAN Revised Background Papers · 14 Jul 2025 View ↗ PDF BNG PLAN Revised Background Papers · 27 May 2025 View ↗ PDF BNG CALCULATION Revised Background Papers · 27 May 2025 View ↗ PDF GCN SURVEY Revised Background Papers · 27 May 2025 View ↗ PDF ECOLOGY Consultee Comment · 15 Apr 2025 View ↗ PDF GS SURVEY Background Papers · 4 Apr 2025 View ↗ PDF FLOOD AND WATER MANAGEMENT COMMENT Consultee Comment · 20 Mar 2025 View ↗ PDF SUSTAINABILITY OFFICER Consultee Comment · 24 Feb 2025 View ↗ PDF SUSTAINABILITY OFFICER COMMENT Consultee Comment · 20 Feb 2025 View ↗ PDF 2306-062/CTMP/01 TRANSPORT STATEMENT & CTMP PART 1 OF 2. Background Papers · 3 Feb 2025 View ↗ PDF P24-318 V2.2 ARCHAEOLOGY & HERITAGE DBA Background Papers · 3 Feb 2025 View ↗ PDF P24-318 V2.2 ARCHAEOLOGY & HERITAGE DBA Background Papers · 3 Feb 2025 View ↗ PDF P24-318 V2.2 ARCHAEOLOGY & HERITAGE DBA Background Papers · 3 Feb 2025 View ↗ PDF 2306-062/CTMP/01 TRANSPORT STATEMENT & CTMP PART 2 OF 2 Background Papers · 3 Feb 2025 View ↗ PDF 2205-R004 DESIGN AND ACCESS STATEMENT (FINAL) Background Papers · 21 Jan 2025 View ↗ PDF 1300/09 LANDSCAPE AND ECOLOGICAL ENHANCEMENT PLAN Drawing · 20 Dec 2024 View ↗ PDF 1300/09 LANDSCAPE AND ECOLOGICAL ENHANCEMENT PLAN: PARCEL 10 Drawing · 20 Dec 2024 View ↗ PDF 1300/09 LANDSCAPE AND ECOLOGICAL ENHANCEMENT PLAN: PARCELS 1 TO 5 Drawing · 20 Dec 2024 View ↗ PDF 1300/09 LANDSCAPE AND ECOLOGICAL ENHANCEMENT PLAN: PARCELS 6 TO 8 Drawing · 20 Dec 2024 View ↗ PDF PLANNING STATEMENT Background Papers · 20 Dec 2024 View ↗ PDF 1300/9 SHEETS 1-4 LANDSCAPE AND ECOLOGICAL ENHANCEMENTS Drawing · 20 Dec 2024 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Background Papers · 20 Dec 2024 View ↗ PDF WOR 4910 ECOLOGICAL IMPACT ASSESSMENT Background Papers · 20 Dec 2024 View ↗ PDF GREAT CRESTED NEWT SURVEY REPORT Background Papers · 20 Dec 2024 View ↗ PDF WOR 4910 BIODIVERSITY NET GAIN PLAN Biodiversity · 20 Dec 2024 View ↗ PDF NOISE IMPACT ASSESSMENT PAGES 1 - 22 Background Papers · 20 Dec 2024 View ↗ PDF NOISE IMPACT ASSESSMENT PAGES 23- 50 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE ASSESSMENT FIG 1 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE ASSESSMENT ROAD RECEPTORS FIG 2 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE ROAD ASSESSMENT PAGES 100 TO 149 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE ASSESSMENT Background Papers · 20 Dec 2024 View ↗ PDF BHA 5704 01 TREE SURVEY PLANS Background Papers · 20 Dec 2024 View ↗

Plans & drawings 36

PDF TREE RETENTION AND REMOVAL PLAN Revised Background Papers · 14 Jul 2025 View ↗ PDF C R E 019-P L -001 ACCESS TRACK CROSS SECTION Drawing · 20 Dec 2024 View ↗ PDF C E L -S T D -C C T V-002 SECURITY CAMERA MAST Drawing · 20 Dec 2024 View ↗ PDF C E L -S T D -F E -002 PROPOSED DEER FENCING Drawing · 20 Dec 2024 View ↗ PDF C E L -S T D -G A-001 TYPICAL GATE ELEVATIONS Drawing · 20 Dec 2024 View ↗ PDF C E L -S T D -MV-S UB -001 PROPOSED MV SUBSTATION ELEVATIONS Drawing · 20 Dec 2024 View ↗ PDF C E L -S T D -P V-002 REV A INDICATIVE ARRAY CROSS SECTION Drawing · 20 Dec 2024 View ↗ PDF C E L -S P -S T -001 SPARE PARTS CONTAINER ELEVATIONS Drawing · 20 Dec 2024 View ↗ PDF CEL-STD-SUB-132KV-001 SUBSTATION ELEVATIONS AND SECTIONS Drawing · 20 Dec 2024 View ↗ PDF C R E 019-C C -001 CONSTRUCTION COMPOUND NORTH Drawing · 20 Dec 2024 View ↗ PDF C R E 019-C C -002 CONSTRUCTION COMPOUND CENTRAL Drawing · 20 Dec 2024 View ↗ PDF C R E 019-C C -003 REV 1 CONSTRUCTION COMPOUND SOUTH Drawing · 20 Dec 2024 View ↗ PDF CRE019 EL-01 REV 02 TITCHFIELD LANE CROSS SECTION Drawing · 20 Dec 2024 View ↗ PDF CRE019 EP 001 LAYOUT PLAN - EXISTING Drawing · 20 Dec 2024 View ↗ PDF C R E 019-F P -001 PROPOSED FOOT PATH DIVERSION Drawing · 20 Dec 2024 View ↗ PDF C R E 019-IC R -001 REV A INDICATIVE PROPOSED CABLE ROUTE Drawing · 20 Dec 2024 View ↗ PDF C R E 019-L P -002 REV 11 THE LOCATION PLAN Drawing · 20 Dec 2024 View ↗ PDF C R E 019-P L -001 BLOCK PLAN OF THE SITE Drawing · 20 Dec 2024 View ↗ PDF CRE019 CC 001 LAYOUT PLAN NORTH Drawing · 20 Dec 2024 View ↗ PDF C R E 019-P L -003 REV 01 PROPOSED LAYOUT PLAN CENTRAL Drawing · 20 Dec 2024 View ↗ PDF C R E 019-P L -004 PROPOSED LAYOUT SOUTH Drawing · 20 Dec 2024 View ↗ PDF CRE019 SD-02 REV 02 PROPOSED CUSTOMER SWITCHGEAR ELEVATIONS Drawing · 20 Dec 2024 View ↗ PDF CRE019 SD-04 REV 03 PROPOSED FENCING Drawing · 20 Dec 2024 View ↗ PDF APPENDIX LISTED BUILDINGS MAP Drawing · 20 Dec 2024 View ↗ PDF C R E 019-P L -002 PLANNING LAYOUT OVERVIEW Drawing · 20 Dec 2024 View ↗ PDF RMA-C2653 APPENDIX B PLANNING LAYOUT Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLANS SHEETS 2-4 Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLAN SHEETS 5 AND 6 Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLANS SHEETS 7&8 Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLANS SHEETS 9 AND 10 Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLANS SHEETS 11 & 12 Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLAN SHEETS 13 &14 Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLAN - SHEET 15 -17 Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA SITE PLAN SHEET 18 AND APPENDIX C Background Papers · 20 Dec 2024 View ↗ PDF 2306-062/CTMP/01 PROPOSED ACCESS AND VISIBILITY SPLAYS Drawing · 20 Dec 2024 View ↗ PDF BHA 5704 02 TREE REPORT SECTIONS 1 - 8 Background Papers · 20 Dec 2024 View ↗

Consultation & comments 69

PDF TREES Consultee Comment · 13 Aug 2025 View ↗ PDF NETWORK RAIL CONSULTATION RESPONSE Consultee Comment · 24 Jul 2025 View ↗ PDF NETWORK RAIL CONSULTATION RESPONSE Consultee Comment · 24 Jul 2025 View ↗ PDF WCC LANDSCAPE TEAM Consultee Comment · 23 Jul 2025 View ↗ PDF AGENT RESPONSE TO LANDSCAPE COMMENTS Revised Background Papers · 16 Jul 2025 View ↗ PDF TREES Consultee Comment · 1 Jul 2025 View ↗ PDF WCC HISTORIC ENVIRONMENT Consultee Comment · 1 Jul 2025 View ↗ PDF WCC LANDSCAPE TEAM Consultee Comment · 17 Jun 2025 View ↗ PDF APPLICANT RESPONSE Revised Background Papers · 27 May 2025 View ↗ PDF APPLICANT RESPONSE TO PUBLIC COMMENTS Revised Background Papers · 27 May 2025 View ↗ PDF FURTHER COMMENT HCC COUNTRYSIDE SERVICES Consultee Comment · 1 May 2025 View ↗ PDF FURTHER COMMENT HCC COUNTRYSIDE SERVICES Consultee Comment · 1 May 2025 View ↗ PDF WCC ARCHAEOLOGY HISTORIC ENVIRONMENT TEAM Consultee Comment · 7 Apr 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 4 Apr 2025 View ↗
PDF HAMPSHIRE COUNTRYSIDE PLANNING Consultee Comment · 4 Apr 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 24 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 24 Mar 2025 View ↗
PDF SHEDFIELD PC Consultee Comment · 24 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF UPDATED WICKHAM AND KNOWLE PARISH COUNCIL Consultee Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 20 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 18 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 18 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 18 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 17 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 17 Mar 2025 View ↗
PDF HIOW FIRE AND RESCUE Consultee Comment · 14 Mar 2025 View ↗ PDF SDNPA Consultee Comment · 13 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 11 Mar 2025 View ↗
PDF HCC HIGHWAYS Consultee Comment · 11 Mar 2025 View ↗ PDF HIGHWAYS Consultee Comment · 10 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 10 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 10 Mar 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 5 Mar 2025 View ↗
PDF CPRE HAMPSHIRE COMMENTS Consultee Comment · 4 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 4 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 3 Mar 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 3 Mar 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 27 Feb 2025 View ↗
PDF ENVIRONMENTAL HEALTH Consultee Comment · 25 Feb 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 25 Feb 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 25 Feb 2025 View ↗
PDF TREES Consultee Comment · 24 Feb 2025 View ↗ PDF WCC HISTORIC ENVIRONMENT Consultee Comment · 24 Feb 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 24 Feb 2025 View ↗
PDF COUNTRYSIDE CONSULTATION RESPONSE Consultee Comment · 21 Feb 2025 View ↗ PDF HISTORIC ENGLAND RESPONSE Consultee Comment · 21 Feb 2025 View ↗ PDF HISTORIC ENGLAND Consultee Comment · 20 Feb 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 18 Feb 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 18 Feb 2025 View ↗
PDF NATURESPACE COMMENT Consultee Comment · 18 Feb 2025 View ↗ PDF NATURAL ENGLAND Consultee Comment · 18 Feb 2025 View ↗ PDF SOUTHERN WATER COMMENT Consultee Comment · 17 Feb 2025 View ↗ PDF LANDSCAPE Consultee Comment · 14 Feb 2025 View ↗ PDF FAREHAM BOROUGH COUNCIL Consultee Comment · 13 Feb 2025 View ↗ PDF WCC LANDSCAPE TEAM Consultee Comment · 13 Feb 2025 View ↗ PDF WCC _ ENV HEALTH Consultee Comment · 13 Feb 2025 View ↗ PDF NATIONAL GRID Consultee Comment · 12 Feb 2025 View ↗ PDF ENVIRONMENT AGENCY Consultee Comment · 12 Feb 2025 View ↗ PDF WCC _ ENV HEALTH Consultee Comment · 12 Feb 2025 View ↗ PDF WCC _ ENV HEALTH Consultee Comment · 12 Feb 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 12 Feb 2025 View ↗
PDF PORTSMOUTH WATER - NO COMMENTS Consultee Comment · 6 Feb 2025 View ↗

Other documents 53

PDF Correspondence EOT Correspondence EOT · 12 Aug 2025 View ↗ PDF Correspondence EOT Correspondence EOT · 4 Aug 2025 View ↗ PDF WATER PIPELINE AREA Revised Background Papers · 27 May 2025 View ↗ PDF ECIA Revised Background Papers · 27 May 2025 View ↗ PDF COVER LETTER Revised Background Papers · 27 May 2025 View ↗ PDF LETTER REGARDING CONTAMINATED LAND Background Papers · 24 Jan 2025 View ↗ PDF 2205-R004 APPENDIX B TO DAS Background Papers · 21 Jan 2025 View ↗ PDF 2306-062/CTMP/01 CTMP PART 1 OF 2. Background Papers · 21 Jan 2025 View ↗ PDF 1300 V1.4 LVIA PHOTOS PAGES 11 -16 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA PHOTOS PAGES 1 - 10 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA MAPS Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA CONSTRAINTS MAPS Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA BAREGROUND ZTV PARCELS 1-5 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA SCREENED ZTV PARCELS 1-9 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA SCREENED ZTV PARCEL 10 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS PARCELS 1-5 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA ENTRANCE TO PLOTS 1-5 PHOTOMONTAGES Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA PARCEL 8 PHOTOS AND MOCK UPS Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA ROW PHOTO MONTAGE Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA EXISTING SUMMER PHOTOS Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 4-6 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 7 AND 8 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA EXISTING SUMMER VIEWS Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINT 9 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 9 AND 10 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 11 AND 12 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA EXISTING VIEWPOINT 13 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 1,2 AND 3 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 4, 5 AND 6 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 7 AND 8 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA EXISTING VIEWPOINT 9 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA VIEWPOINTS 10 AND 11 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA EXISTING VIEWPOINT 12 Background Papers · 20 Dec 2024 View ↗ PDF 1300 V1.4 LVIA Background Papers · 20 Dec 2024 View ↗ PDF RMA-C2653 FRA Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE RAIL RECEPTORS FIG 3 Background Papers · 20 Dec 2024 View ↗ PDF WOR4910 EIA PROPOSED MITIGATION FIGURE 4 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE RESIDENTIAL PART 1 PAGES 1 -69 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE RESIDENTIAL PART 1 PAGES 70 - 116 AND PART 2 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE RESIDENTIAL PART 2 PAGES 14 -56 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE RESIDENTIAL PART 2 PAGES 57 - 100 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE ROAD PAGES 53 - 99 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE RESIDENTIAL PART 2 PAGES 145-169 AND PART 3 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE ROAD PAGES 1-52 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE ROAD PAGES 150- 169 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE RAIL RECEPTORS Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE AVIATION RECEPTORS Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE APPENDIX F 1-34 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE APPENDIX F PAGES 35 -75 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE APPENDIX F PAGES 76 - 104 Background Papers · 20 Dec 2024 View ↗ PDF GLINT AND GLARE SOLAR MODULE GLARE AND REFLECTANCE TECHNICAL MEMO Background Papers · 20 Dec 2024 View ↗ PDF 5704 TREE REPORT AIA Background Papers · 20 Dec 2024 View ↗ PDF C1139 AGRICULTURAL LAND CLASSIFICATION Background Papers · 20 Dec 2024 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 211 m away: Hampshire Water Transfer and Water Recycling Project
The site is 211 m from the project boundary. Dam or reservoir, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a solar farm?

Plota Sites searches every land parcel in England and Wales: 29,327 sites fit this search. On and off the market, free to search.

Land for solar farms
Work with planning data?

Every application in Winchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Winchester
Application type
Full Application
Received
20 Dec 2024
Validated
3 Feb 2025
Ward
SOUTHWICK AND WICKHAM WARD
Parish
Wickham And Knowle
Case officer
Show
Target decision
5 May 2025
Decision
Application Permitted
Decision date
25 Sept 2025
Decision level
Committee Decision
Applicant
Show
Agent
Aardvark EM Limited

How this decision compares

Decided in 234 days from validation, 150 days slower than Winchester's median of 84 for full applications. Approved, as 86% of full applications here are.

22%decided within 8 weeks
86%approved
5%go to committee

Plota live figures for full applications decided by Winchester in the last twelve months, from validation. Winchester decision record →

Consultation & key dates

Alt. reference
PP-13574860
Planning Portal ref
PP-13574860
Statutory expiry
5 May 2025
Env. assessment
No
Winchester
Planning Authority Score
4.5/10
Below average
#177 of 296 councils
Relevant to this application:
Householder decisions

Winchester is slower than most councils at deciding householder applications, ranking #213 out of 296. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Winchester decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #72 of 296
97%
Householder approved
Above avg (90%) #47 of 296
55%
Decided in 8 weeks
Below avg (63%) #213 of 296
50%
Extended time limit
Above avg (41%) #230 of 296
70%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
88%
Change of use approved
32 decided
918
Total decisions
60 refused in the year to March 2026