Hethe Place Farm, Hartfield Road, Cowden, Edenbridge Data via plota.co.uk

WD/2026/1844/OH - Overhead Line Allocated to Officer

Proposal

Upgrade of 2 spans of hv overhead line increasing the conductors from 2c to 3c from pole 243560 to 243561 and installing an upgraded pole mounted transform form 50kVA to 100kVA on pole 243561 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Sept 2026
Decision
Expected by 22 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 3 Nov 2026, from Wealden's recent utility and infrastructure works.

Site constraints 4

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
High Weald National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wealden - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wealden
Application type
Overhead Line
Received
10 Sept 2026
Validated
10 Sept 2026
Ward
Hartfield
Parish
Hartfield
Target decision
22 Oct 2026
Applicant
Show
Agent
UK Power Networks

Decision outlook

Day 29 of the 56-day target. Wealden usually decides utility and infrastructure works by day 54.

Day 2927 days to the 56-day target
69%decided within 8 weeks
88%approved
37decided in the last year

Plota live figures for utility and infrastructure works decided by Wealden in the last twelve months, from validation. Wealden decision record →

Wealden
Planning Authority Score
4.2/10
Below average
#188 of 296 councils
Relevant to this application:
Householder decisions

Wealden ranks #132 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Wealden decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #231 of 296
88%
Householder approved
Below avg (90%) #227 of 296
69%
Decided in 8 weeks
Above avg (63%) #132 of 296
40%
Extended time limit
Below avg (41%) #156 of 296
66%
Minor dwellings approved
170 decided (1-9 homes)
78%
Major dwellings approved
32 decided (10+ homes)
74%
Change of use approved
82 decided
1,361
Total decisions
220 refused in the year to March 2026