2026/1298/DISC - Approval of Details Reserved by Condition(s) Decided

Proposal

Application for the approval of details reserved by conditions 3 (Habitat Management and Monitoring Plan) and 5 (Construction Environmental Management Plan) attached to approval (Removal of existing tanks and structure and construction of new water storage tanks, a single storey pump dosing building, a single storey storage building, retaining walls and bases). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2026
✓
Discharge of Conditions
1 Sept 2026

Discharge of Conditions on 1 Sept 2026 · Delegated · Last checked 14 Sept 2026

Associated applications 2

  • Part of

    Variationcouncil archive

    Conditions details submitted for 3, 5

    • ConditionsApplication for the approval of details reserved by conditions 3 (Habitat Management…This application2026/1298/DISC

Site constraints 6

Ancient woodland: Salter Wood
Irreplaceable habitat. Standing advice asks for a 15 m buffer from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 721 m away: A66 Northern Trans-Pennine Project
The site is about 721 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Cliburn built-up area; Priority habitat about 34 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Condition(s)
Postcode
CA10 2DW
Received
25 Jun 2026
Validated
25 Jun 2026
Ward
Eden and Lyvennet Vale
Parish
Brougham
Case officer
Show
Decision
Discharge of Conditions
Decision date
1 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
Unwin Jones Partnership

Consultation & key dates

Statutory expiry
1 Sept 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Major dwellings

Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions