Units 1 and 2, Quest 271 Test Lane Southampton SO16 9SD Data via plota.co.uk

26/01259/SCR - Screening for EIA Awaiting decision

Proposal

Request for a screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the extension and alteration of the existing buildings and extension of the lawful use to comprise Use Class B2, Use Class B8, Use Class E(g)(ii) and Use Class E(g)(iii), together with the erection of an external draw tower, rooftop extensions & alterations, extensions to existing mezzanine levels, installation of external plant & flues, car and cycle parking, minor external alterations and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 2 Nov 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Dec 2026, from Southampton's recent commercial and major works.

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special protection area 101 m away: Solent & Southampton Water
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 101 m away: Chilbolton Common SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Screening for EIA
Postcode
SO16 9SD
Received
around 2 Nov 2026
Validated
2 Nov 2026
Ward
Redbridge
Case officer
Show
Target decision
23 Nov 2026
Applicant
Show
Agent
CBRE UK Planning

Decision outlook

Day 21 of the 56-day target. Southampton usually decides commercial and major works by day 56.

Day 2135 days to the 56-day target
56%decided within 8 weeks
89%approved
28decided in the last year

Plota live figures for commercial and major works decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
26625
Statutory expiry
23 Nov 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 overall
Relevant to this application:
Householder decisions

Southampton is #158 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026