Anchor Paddock, The Tree House Batchelors Lane Holt BH21 7DS Data via plota.co.uk

P/FUL/2025/04518 - Full Planning Application Approved

Proposal

Re-use of the existing building (known as The Treehouse) for holiday let purposes. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Aug 2025
✓
Approved
20 Feb 2026

Approved on 20 Feb 2026 · Delegated · Last checked 25 Oct 2026

Site constraints 8

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Public footpath 10 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National nature reserve 311 m away: Holt Heath
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Radon affected area, class 3; SSSI 452 m away: Holt and West Moors Heaths SSSI; Inside the Chalbury Common built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area269 m² (2,895 sq ft)
Energy ratingD (63 out of 100), could reach C
PropertyDetached house, 7 habitable rooms
Built1930 to 1949
HeatingBoiler and underfloor heating, oil
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in November 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Full Planning Application
Postcode
BH21 7DS
Received
1 Aug 2025
Validated
1 Aug 2025
Ward
Stour and Allen Vale Ward
Parish
Holt
Case officer
Show
Decision
Granted
Decision date
20 Feb 2026
Decision level
Delegated

How this decision compares

Decided in 203 days from validation, 126 days slower than Dorset's median of 77 for full applications. Approved, as 86% of full applications here are.

38%decided within 8 weeks
86%approved
8%go to committee

Plota live figures for full applications decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
7 Oct 2025
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.