20, Station Street, Walsall, WS2 9JZ Data via plota.co.uk

25/0726 - Full Application Approved

Proposal

Retropsective planning application for the change of use from hotel (use class C1) to 14no. bedroom HMO (use class Sui Generis). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Aug 2025
✓
Approved
7 Jan 2026

Approved on 7 Jan 2026 · Last checked 16 Oct 2026

Site constraints 6

2 listed buildings within 150 m of the postcode pin
Nearest: 22, 23 & 24 Station Street (St James's Place), Grade II, about 6 m from the postcode pin · 1 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 2; Nature improvement area: Birmingham and the Black Country; Coalfield, development low risk area; Inside the Walsall built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a hotel?

Plota Sites searches every land parcel in England and Wales: 5,696 sites fit this search. On and off the market, free to search.

Land for budget hotels
Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Full Application
Postcode
WS2 9JZ
Received
15 Aug 2025
Validated
15 Aug 2025
Ward
St Matthews (pre May 2026 ward change)
Case officer
Show
Target decision
10 Oct 2025
Decision
Grant Permission Subject to Conditions
Decision date
7 Jan 2026
Applicant
Show
Agent
Spector Design Ltd

How this decision compares

Decided in 145 days from validation, 38 days slower than Walsall's median of 107 for full applications. Approved, as 78% of full applications here are.

16%decided within 8 weeks
78%approved
193decided in the last year

Plota live figures for full applications decided by Walsall in the last twelve months, from validation. Walsall decision record →

Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 overall
Relevant to this application:
Change of use

Walsall is slower than most councils at deciding householder applications: #228 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026