Northstowe Phase 2C Rampton Drift Longstanton Cambridgeshire Data via plota.co.uk

26/00786/REM - Approval of Reserved Matters Approved

Proposal

Reserved Matters application for Parcel 2C to provide 409 dwellings including Discount Market Sale homes, Affordable Rented homes, and Market homes, landscaping, open space including village green, allotments and community orchard, parking and associated infrastructure for access, appearance, landscaping, layout and scale following outline planning permission Ref: , and Discharge of outline conditions 9 (Design Code), 10 (Fire Strategy), 11 (Housing Mix), 12 (Housing Lifetime Home Design Statement), 19 (Detailed Surface Water Drainage Strategy), 20 (Foul Water Strategy), 21 (Adoption of SUDS infrastructure), 23 (Landscape Design and Specifications), 24 (Landscape Management and Maintenance Plan), 26 (Tree Protection Details), 27 (Ecological Management Plan), 32 (Low Carbon Strategy Compliance Statement), 33 (Energy Delivery Strategy), 35 (Water Conservation and Management Scheme), 41 (Artificial Lighting Scheme), 43 (Operational Traffic Noise Mitigation Scheme on-site), 45 (Waste Management and Minimisation Strategy), 48 (Equine, Walking and Cycling Routes), 54 (Electric Vehicle Charging Compliance Statement), 57 (Transport Cycle Parking), 64 (Custom Build Homes), pursuant to outline planning permission Ref: . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Feb 2026
✓
Consultation
9 Apr 2026
✓
Approved
1 Sept 2026

Approved on 1 Sept 2026 · Delegated Decision · Last checked 1 Sept 2026

Documents 174

Statements & assessments 45

PDF APPLICANT'S NOISE CONSULTANT EMAIL DATED 06.08.26 RE PURGE VENTILATION Agent / Applicant Comments · 6 Aug 2026 View ↗ PDF REVISED DRAINAGE STRATEGY Application Survey / Assessment / Statement · 5 Aug 2026 View ↗ PDF DRAINAGE STRATEGY PAGE 1-50 Application Survey / Assessment / Statement · 20 Jul 2026 View ↗ PDF DRAINAGE STRATEGY PAGE 51-100 Application Survey / Assessment / Statement · 20 Jul 2026 View ↗ PDF DRAINAGE STRATEGY PAGE 101-150 Application Survey / Assessment / Statement · 20 Jul 2026 View ↗ PDF DRAINAGE STRATEGY PAGE 151-222 Application Survey / Assessment / Statement · 20 Jul 2026 View ↗ PDF DESIGN AND ACCESS STATMENT -ADDENDUM PART 2 Design and Access Statement · 20 Jul 2026 View ↗ PDF ACOUSTICS, VIBRATION AND AIR QUALITY Application Survey / Assessment / Statement · 20 Jul 2026 View ↗ PDF SUSTAINABILITY Consultee Comments · 14 Jul 2026 View ↗ PDF MAJOR TRANSPORT TEAM COMMENTS Consultee Comments · 10 Jul 2026 View ↗ PDF ECOLOGY Consultee Comments · 7 Jul 2026 View ↗ PDF ECOLOGICAL NOTE Application Information · 6 Jul 2026 View ↗ PDF ECOLOGY Consultee Comments · 26 Jun 2026 View ↗ PDF LOCAL LEAD FLOOD AUTHORITY Consultee Comments · 25 Jun 2026 View ↗ PDF DRAINAGE STRATEGY - PART 1 Application Survey / Assessment / Statement · 11 Jun 2026 View ↗ PDF DRAINAGE STRATEGY - PART 4 Application Survey / Assessment / Statement · 11 Jun 2026 View ↗ PDF DRAINAGE STRATEGY - PART 3 - PAGES 1-50 Application Survey / Assessment / Statement · 11 Jun 2026 View ↗ PDF DRAINAGE STRATEGY - PART 3 - PAGES 51-100 Application Survey / Assessment / Statement · 11 Jun 2026 View ↗ PDF DRAINAGE STRATEGY - PART 3 - PAGES 100-136 Application Survey / Assessment / Statement · 11 Jun 2026 View ↗ PDF DRAINAGE STRATEGY - PART 2 Application Survey / Assessment / Statement · 11 Jun 2026 View ↗ PDF DAS-ADDENDUM Design and Access Statement · 10 Jun 2026 View ↗ PDF NORTHSTOWE 2C - ENERGY AND SUSTAINABILITY STATEMENT - REV2 - 08JUN2026 Application Information · 10 Jun 2026 View ↗ PDF DRAINAGE RESPONSE TO LLFA Application Information · 10 Jun 2026 View ↗ PDF HIGHWAY STATEMENT Application Information · 10 Jun 2026 View ↗ PDF COMPLIANCE ASSESSMENT - KEEPMOAT - NORTHSTOWE PHASE 2 PARCEL 2C_FEB 26 (1) Application Information · 10 Jun 2026 View ↗ PDF NORTHSTOWE 2C - ENERGY AND SUSTAINABILITY STATEMENT - REV2 - 08JUN2026 Application Survey / Assessment / Statement · 10 Jun 2026 View ↗ PDF ECOLOGY Consultee Comments · 16 Apr 2026 View ↗ PDF MAJOR TRANSPORT TEAM Consultee Comments · 14 Apr 2026 View ↗ PDF SUSTAINABILITY Consultee Comments · 11 Apr 2026 View ↗ PDF LOCAL LEAD FLOOD AUTHORITY Consultee Comments · 1 Apr 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 1 OF 4 Design and Access Statement · 27 Feb 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 2 OF 4 Design and Access Statement · 27 Feb 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 3 OF 4 Design and Access Statement · 27 Feb 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 4 OF 4 Design and Access Statement · 27 Feb 2026 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT PART 1 Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT PART 2 Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT PART 3 Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF DRAINAGE STRATEGY AND SUD MANAGEMENT AND MAINTENCANCE PLAN Application Information · 27 Feb 2026 View ↗ PDF ECOLOGICAL MANAGEMENT PLAN Application Information · 27 Feb 2026 View ↗ PDF FLOOD RISK ASSESSMENT TECHNICAL NOTE PHASE 2C Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF HIGHWAY STATEMENT Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF ENERGY AND SUSTAINABIITY STATEMENT Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF PLANNING STATEMENT Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF EIA STATEMENT OF CONFORMITY Application Survey / Assessment / Statement · 27 Feb 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Application Survey / Assessment / Statement · 27 Feb 2026 View ↗

Plans & drawings 51

PDF 1424 GSA HE4 ZZ DR A 2200 REV P02 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HF4 ZZ DR A 2200 REV P02 HT21 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HH1 ZZ DR A 2200 HT28A REV P02 HT28A PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HG1 ZZ DR A 2200 REV P02 HT22 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HJ4 ZZ DR A 2200 REV P02 HT36 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HK4 ZZ DR A 2200 REV P02 HT44A PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HI1 ZZ DR A 2200 REV P02 HT35A PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HM3 ZZ DR A 2200 REV P02 HT53 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HN4 ZZ DR A 2200 REV P02 HT57 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HL1 ZZ DR A 2200 REV P02 HT50 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HO3 ZZ DR A 2101 REV P02 BESPOKE FOG 2 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HP3 ZZ DR A 2100 REV P02 FOG DRIVETHROUGH PLANS AND ELEVATIONP02 Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HQ4 ZZ DR A 2200 REV P02 LAMBETH PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HR4 ZZ DR A 2200 REV P02 ROUNDHILL 3B PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HS4 ZZ DR A 2200 REV P02 ROUNDHILL 4B PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HD4 ZZ DR A 2200 REV P02 HT14 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HO3 ZZ DR A 2100 REV P02 BESPOKE FOG 1 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HV4 ZZ DR A 2200 REV P02 HT12 PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW 00 DR A 1002 REV P02 EXISTING SITE PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW 00 DR A 1003 REV P02 PROPOSED GROUND FLOOR SITE PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA HA4 ZZ DR A 2200 REV P02 OULSTON PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW 00 DR A 1180 REV P02 FIRE STRATEGY PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW 00 DR A 1200 REV P02 UNIT MIX PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW RF DR A 1004 REV P03 PROPOSED SITE ROOF PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW RF DR A 1110 REV P04 MATERIAL PLAN STRATEGY Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW RF DR A 1160 REV P03 M4 2 AND M43 STRATEGY PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW RF DR A 1300 REV P03 TENURE PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 3200 REV P01 APARTMENT BLOCK 1 PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 3201 REV P01 APARTMENT BLOCK 2 PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 3205 REV P02 APARTMENT BLOCK 6 PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 3206 REV P01 APARTMENT BLOCK 7 PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 3207 REV P01 APARTMENT BLOCK 8 PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 4200 REV P02 SITE SECTION A THE BOULEVARD Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 4201 REV P02 SITE SECTION B THE AVENUE Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 4203 REV P02 SITE SECTION D PARK EDGE Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 4204 REV P02 SITE SECTION E LEAFY LANES Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 4220 ILLUSTRATIVE CROSS SECTIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2200 REV P01 APARTMENT BLOCK 1 PROPOSED GENERAL ARRANGERMENT PLAN Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2201 REV P01 APARTMENT BLOCK 2 PROPOSED GENERAL ARRANGEMENT PLANS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2202 REV P01 APARTMENT BLOCK 3 PROPOSED GENERAL ARRANGEMENT PLANS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 3202 REV P01 APARTMENT BLOCK 3 PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2204 REV P01 APARTMENT BLOCK 5 PROPOSED GENERAL ARRANGEMENT PLANS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2205 REV P02 APARTMENT BLOCK 6 PROPOSED GENERAL ARRANGEMENT PLANS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2206 REV P01 APARTMENT BLOCK 7 PROPOSED GENERAL ARRANGEMENT PLANS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2207 REV P01 APARTMENT BLOCK 8 PROPOSED GENERAL ARRANGEMENT PLANS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424-GSA-ZZ-ZZ-DR-A-3205 REV P01 APARTMENT BLOCK 6 PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424GSAHB4ZZDRA2200 REV P02 RYEBANK PLANS AND ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZ ZZ DR A 3203 REV P01 APARTMENT BLOCK 4 - PROPOSED ELEVATIONS Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA ZZZ 01 DR A 2203 REV P01 APARTMENT BLOCK 4 - PROPOSED GA PLANS Superseded Documents · 27 Feb 2026 View ↗ PDF SURFACE WATER MANAGEMENT PLAN Application Information · 27 Feb 2026 View ↗ PDF SURFACE WATER MANAGEMENT PLAN Application Information · 27 Feb 2026 View ↗

Consultation & comments 34

PDF Commenter’s name hidden Show Third Party Comments · 16 Aug 2026 View ↗
PDF Commenter’s name hidden Show Third Party Comments · 16 Aug 2026 View ↗
PDF LLFA Consultee Comments · 11 Aug 2026 View ↗ PDF URBAN DESIGN FINAL COMMENTS Consultee Comments · 7 Aug 2026 View ↗ PDF CONSULTEE COMMENT SUBMITTED ONLINE Consultee Comments · 31 Jul 2026 View ↗ PDF ENVIRONMENTAL PLANNING Consultee Comments · 31 Jul 2026 View ↗ PDF LLFA Consultee Comments · 30 Jul 2026 View ↗ PDF HIGHWAYS DEPT Consultee Comments · 30 Jul 2026 View ↗ PDF HIGHWAYS DEPT Consultee Comments · 30 Jul 2026 View ↗ PDF URBAN DESIGN Consultee Comments · 19 Jul 2026 View ↗ PDF BNE LANDSCAPE Consultee Comments · 8 Jul 2026 View ↗ PDF HOUSING STRATEGY Consultee Comments · 6 Jul 2026 View ↗ PDF WASTE - SHARED SERVICE Consultee Comments · 23 Jun 2026 View ↗ PDF NORTHSTOWE TOWN COUNCIL Consultee Comments · 23 Jun 2026 View ↗ PDF COMMUNITIES TEAM COMMENTS Consultee Comments · 23 Jun 2026 View ↗ PDF COVERING EMAIL FROM AGENT RE: AMENDMENT Agent / Applicant Comments · 8 Jun 2026 View ↗ PDF COMMUNITIES TEAM COMMENTS Consultee Comments · 28 May 2026 View ↗ PDF ANGLIAN WATER REPORT Consultee Comments · 23 Apr 2026 View ↗ PDF BNE LANDSCAPE Consultee Comments · 21 Apr 2026 View ↗ PDF URBAN DESIGN Consultee Comments · 21 Apr 2026 View ↗ PDF NORTHSTOWE TOWN COUNCIL Consultee Comments · 20 Apr 2026 View ↗ PDF LOCAL HIGHWAY AUTHORITY Consultee Comments · 9 Apr 2026 View ↗ PDF HIGHWAYS DEPT Consultee Comments · 9 Apr 2026 View ↗ PDF LOCAL HIGHWAY AUTHORITY Consultee Comments · 9 Apr 2026 View ↗ PDF INTERIM HOUSING STRATEGY COMMENTS Consultee Comments · 8 Apr 2026 View ↗ PDF ACTIVE TRAVEL ENGLAND Consultee Comments · 8 Apr 2026 View ↗ PDF CLIMATE, WASTE & ENVIRONMENT Consultee Comments · 7 Apr 2026 View ↗
PDF Commenter’s name hidden Show Third Party Comments · 7 Apr 2026 View ↗
PDF Commenter’s name hidden Show Third Party Comments · 7 Apr 2026 View ↗
PDF Commenter’s name hidden Show Third Party Comments · 7 Apr 2026 View ↗
PDF Commenter’s name hidden Show Third Party Comments · 7 Apr 2026 View ↗
PDF REVISED WASTE SERVICES Consultee Comments · 1 Apr 2026 View ↗ PDF DESIGNING OUT CRIME OFFICER Consultee Comments · 26 Mar 2026 View ↗ PDF MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 16 Mar 2026 View ↗

Other documents 40

PDF EOT REQUEST Extension of Time Request · 17 Aug 2026 View ↗ PDF COVER LETTER Application Information · 20 Jul 2026 View ↗ PDF FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 20 Jul 2026 View ↗ PDF EOT REQUEST Extension of Time Request · 16 Jul 2026 View ↗ PDF FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 11 Jun 2026 View ↗ PDF COVERING EMAIL FOR AMENDMENTS Application Information · 10 Jun 2026 View ↗ PDF NORTHSTOWE LANDSCAPE STRATEGY ADDENDUM Application Information · 10 Jun 2026 View ↗ PDF ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 16 Mar 2026 View ↗ PDF SITE NOTICE Application Press/Site Notices · 16 Mar 2026 View ↗ PDF SITE NOTICE Application Press/Site Notices · 16 Mar 2026 View ↗ PDF SITE NOTICE Application Press/Site Notices · 16 Mar 2026 View ↗ PDF SITE NOTICE Application Press/Site Notices · 16 Mar 2026 View ↗ PDF IDPL LA6242-BP-110 HARD LANDSCAPE GENERAL ARRANGEMENT Superseded Documents · 3 Mar 2026 View ↗ PDF 1424 GSA SW 00 DR A 1120 REV P02 BOUNDARY CONDITIONS STRATEGY Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW 00 DR A 1170 REV P02 STREET HIERARCHY STRATEGY Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW RF DR A 1100 REV P03 CHARACTER AREAS STRATEGY Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW RF DR A 1130 REV P03 REFUSE STRATEGY Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW RF DR A 1140 REV P03 MASSING STRATEGY Superseded Documents · 27 Feb 2026 View ↗ PDF 1424 GSA SW 00 DR A 1150 REV P02 PARKING STRATEGY Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-100 SOFT LANDSCAPE GENERAL ARRANGEMENT Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-120 SOFT LANDSCAPE STRATEGY 1 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-121 SOFT LANDSCAPE STRATEGY 2 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-122 SOFT LANDSCAPE STRATEGY 3 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-123 SOFT LANDSCAPE STRATEGY 4 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-124 HARD LANDSCAPE STRATEGY 1 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-125 HARD LANDSCAPE STRATEGY 2 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-126 HARD LANDSCAPE STRATEGY 3 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF IDPL LA6242-BP-127 HARD LANDSCAPE STRATEGY 4 OF 4 Superseded Documents · 27 Feb 2026 View ↗ PDF ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 27 Feb 2026 View ↗ PDF COVERING LETTER Application Information · 27 Feb 2026 View ↗ PDF APPENDIX 1 ALLOTMENT SPECIFICATION Application Information · 27 Feb 2026 View ↗ PDF LANDSCAPE STRATEGY & OPEN SPACE STRATEGY PART 1 Application Information · 27 Feb 2026 View ↗ PDF LANDSCAPE STRATEGY & OPEN SPACE STRATEGY PART 2 Application Information · 27 Feb 2026 View ↗ PDF LANDSCAPE STRATEGY & OPEN SPACE STRATEGY PART 3 Application Information · 27 Feb 2026 View ↗ PDF LANDSCAPE STRATEGY & OPEN SPACE STRATEGY PART 4 Application Information · 27 Feb 2026 View ↗ PDF LANDSCAPE STRATEGY & OPEN SPACE STRATEGY PART 5 Application Information · 27 Feb 2026 View ↗ PDF OPERATION WASTE MANAGEMENT AND MINIMISATION STRATEGY PART1 Application Information · 27 Feb 2026 View ↗ PDF OPERATION WASTE MANAGEMENT AND MINIMISATION STRATEGY PART 2 Application Information · 27 Feb 2026 View ↗ PDF OPERATION WASTE MANAGEMENT AND MINIMISATION STRATEGY PART 3 Application Information · 27 Feb 2026 View ↗ PDF NORTHSTOWE PHASE 2C DISCHARGE OF CONDTION 43 Application Information · 27 Feb 2026 View ↗

All documents on the council site ↗

Site constraints 1

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Approval of Reserved Matters
Received
27 Feb 2026
Validated
27 Feb 2026
Ward
Longstanton
Parish
Northstowe Town Council
Case officer
Show
Target decision
19 Jun 2026
Decision
Granted Permission
Decision date
1 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Luken Beck MDP ltd

How this decision compares

Decided in 186 days from validation, 131 days slower than Cambridge's median of 55 for community buildings. Approved, as 96% of community buildings here are.

71%decided within 8 weeks
96%approved
28decided in the last year

Plota live figures for community buildings decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

1comment received
1 neutral

219 neighbours consulted · Last counted 1 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
9 Apr 2026
Statutory expiry
19 Jun 2026
Env. assessment
Yes
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Major dwellings

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026