Land To West Of Killin Switching Station Killin Data via plota.co.uk

25/00246/FUL - Full Approved

Proposal

Proposed Battery Energy Storage System (above 20MW and Below 50 MW). Including: Battery systems, inverters, substation, site welfare cabin, CCTV and upgraded vehicle access Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Apr 2025
✓
Consultation
12 May 2025
✓
Approved
8 Sept 2025

Approved on 8 Sept 2025 · Planning Panel · Last checked 27 Oct 2026

Planning committee

Decided by Stirling Planning and Regulation Panel on 2 Sept 2025.

Approved unanimously

As officers recommended.

  • Officers advised approval because the energy storage facility accorded with planning policies and could avoid significant harm with conditions.
  • Consultees raised no objections, and one representation neither supported nor opposed the proposal.
  • The committee unanimously approved the application subject to the listed conditions.
Read how the committee decided The full page covers the proposal, site, officers’ assessment, consultation, committee discussion, vote and decision.

Source: Plota analysis of Stirling's committee minutes of 2 Sept 2025.

Documents 20

All documents on the council site ↗

Site constraints 2

Special area of conservation 143 m away: River Tay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stirling - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Stirling
Application type
Full
Received
30 Apr 2025
Validated
30 Apr 2025
Ward
Ward 1 Trossachs & Teith
Parish
Killin Community Council
Case officer
Show
Target decision
10 Sept 2025
Decision
Approve with Conditions
Decision date
8 Sept 2025
Decision level
Planning Panel
Applicant
Show
Agent
Jack Cook

How this decision compares

Decided in 131 days from validation, 75 days slower than Stirling's median of 56 for full applications. Approved, as 99% of full applications here are.

53%decided within 8 weeks
99%approved
389decided in the last year

Plota live figures for full applications decided by Stirling in the last twelve months, from validation. Stirling decision record →

Public comments

1comment received
1 neutral

1 neighbour consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
100709348-001
Neighbours
9 Sept 2025
Consultation
12 May 2025
Comments by
13 Jun 2025
Site or press notice
23 May 2025
Committee
2 Sept 2025
Statutory expiry
29 Aug 2025
Env. assessment
No