London City Airport Hartmann Road Silvertown London E16 2PX Data via plota.co.uk

25/02430/S106 - Discharge or Modify S106 Obligation Pending

Proposal

Request to comply with Section 106 Agreement attached to planning permission , Education, Employment and Environmental Health Monitoring Obligations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 27 Oct 2025
Decision
Target date was 22 Dec 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 392.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 431 m away: Thames Tideway Tunnel
The site is 431 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 1.2 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Newham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area77 m² (829 sq ft)
Energy ratingA (asset rating 12)
UseOthers: Passenger Terminals
HeatingAir Conditioning

From the energy performance certificate lodged in November 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Discharge or Modify S106 Obligation
Postcode
E16 2PX
Received
around 27 Oct 2025
Validated
27 Oct 2025
Ward
Royal Albert
Parish
Royal Docks Community Forum
Case officer
Show
Applicant
Show

Decision outlook

Day 392, past the statutory target. 94% of section 106 and planning obligations in Newham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 392336 days past the 56-day target
81%decided within 8 weeks
100%approved
125decided in the last year

Plota live figures for section 106 and planning obligations decided by Newham in the last twelve months, from validation. Newham decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 overall
Relevant to this application:
Householder decisions

Newham is #191 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.