East Durham And Houghall Community College Houghall Durham DH1 3SG Data via plota.co.uk

DM/26/02745/VOC - Variation of Condition Pending Consideration

Proposal

Variation of conditions 2, 6, 8, 9, 13, 14, 18, 19 of planning permission ( partial demolition, refurbishment and retention of the existing college buildings, and construction of a new two-storey teaching block and ancillary buildings with associated external works, substation, landscaping and access) as amended by applications ref: DM/25/01902/NMA, DM/26/00329/NMA, and DM/26/01391/NMA to capture the phased demolition of the Science Block and to allow the habitat creation and completion report to be provided/approved within 12 months of occupation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Oct 2026
✓
Validated
14 Oct 2026
✓
Consultation
22 Oct 2026
Decision
Expected by 23 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 23 Dec 2026.

Comments are open until 27 Nov 2026

Comment on this application ↗

Associated applications 9

Site constraints 7

Green belt: Tyne and Wear
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
Radon affected area, class 2; Inside the Durham built-up area; Priority habitat 38 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,048 m² (11,281 sq ft)
Energy ratingB (asset rating 38)
UseResidential Institutions: Universities and Colleges
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in December 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Durham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Durham
Application type
Variation of Condition
Postcode
DH1 3SG
Received
13 Oct 2026
Validated
14 Oct 2026
Ward
Neville's Cross
Parish
City Of Durham
Case officer
Show
Target decision
23 Dec 2026
Decision level
Delegated
Agent
DPP Planning

Public comments

No public comments yet.

192 neighbours consulted · Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15261309
Planning Portal ref
PP-15261309
Neighbours
22 Oct 2026
Consultation
22 Oct 2026
Comments by
27 Nov 2026
Site or press notice
6 Nov 2026
Statutory expiry
23 Dec 2026
Env. assessment
No
Durham
Planning Authority Score
5.2/10
Average
#137 of 296 overall
Relevant to this application:
Householder decisions

Durham is #190 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Durham decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #52 of 296
97%
Householder approved
Above avg (90%) #29 of 296
59%
Decided in 8 weeks
Below avg (63%) #190 of 296
48%
Extended time limit
Above avg (41%) #213 of 296
79%
Minor dwellings approved
95 decided (1-9 homes)
90%
Major dwellings approved
49 decided (10+ homes)
87%
Change of use approved
201 decided
1,706
Total decisions
113 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.