Carey Glass Chester, Arriva North West & Wales, Manor Lane, Hawarden, Deeside, CH5 3QY Data via plota.co.uk

FUL/000522/25 - Full - Building Works Approved

Proposal

The proposal involves the expansion of the existing car parking area to increase on-site vehicle capacity and improve operational efficiency as well as the installation of new security fencing and gates to enhance the overall safety and security of the premises. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Jun 2025
✓
Validated
8 Aug 2025
✓
Approved
15 Sept 2025

Approved on 15 Sept 2025 · DEL Delegated - Officer · Last checked 19 Nov 2026

Associated applications 2

Site constraints 15

Air Safeguarding Consult BAE Birdstrike HazardAir Safeguarding Consult BAE New Telecoms AppAir Safeguarding Consult BAE All developmentAir Safeguarding Consult BAE Structures 10m+County Boundary Flintshire Unitary Authority County BoundaryWindfarm Consultation Area Consult National Air Traffic Services.Existing Waste Management Site Consult Environmental HealthAreas of Advertisement ControlDevelopment Control South TeamFlood Risk TAN15 Zone B Areas known to have been flooded in the past evidenced bFlood Risk TAN15 Zone C1Flood Risk TAN15 Zone C2 Areas of the floodplain without significant flood defenLandfill
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Air Safeguarding Consult BAE Birdstrike HazardCouncil record
Recorded by the council for this site.
Council site ↗
Air Safeguarding Consult BAE New Telecoms AppCouncil record
Recorded by the council for this site.
Council site ↗
Air Safeguarding Consult BAE All developmentCouncil record
Recorded by the council for this site.
Council site ↗
Air Safeguarding Consult BAE Structures 10m+Council record
Recorded by the council for this site.
Council site ↗
County Boundary Flintshire Unitary Authority County BoundaryCouncil record
Recorded by the council for this site.
Council site ↗
Windfarm Consultation Area Consult National Air Traffic Services.Council record
Recorded by the council for this site.
Council site ↗
Existing Waste Management Site Consult Environmental HealthCouncil record
Recorded by the council for this site.
Council site ↗
Areas of Advertisement ControlCouncil record
Recorded by the council for this site.
Council site ↗
Development Control South TeamCouncil record
Recorded by the council for this site.
Council site ↗
Flood Risk TAN15 Zone B Areas known to have been flooded in the past evidenced bCouncil record
Recorded by the council for this site.
Council site ↗
Flood Risk TAN15 Zone C1Council record
Recorded by the council for this site.
Council site ↗
Flood Risk TAN15 Zone C2 Areas of the floodplain without significant flood defenCouncil record
Recorded by the council for this site.
Council site ↗
LandfillCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
National infrastructure project 1.4 km away: HyNet Carbon Dioxide Pipeline.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,130 m² (12,163 sq ft)
Energy ratingC (asset rating 74)
UseOffices and Workshop Businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in September 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Flintshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Flintshire
Application type
Full - Building Works
Postcode
CH5 3QY
Received
16 Jun 2025
Validated
8 Aug 2025
Ward
Flintshire Ward Broughton North East
Parish
Flintshire Community Broughton Bretton Council
Case officer
Show
Target decision
3 Oct 2025
Decision
A01 Approved
Decision date
15 Sept 2025
Decision level
DEL Delegated - Officer
Applicant
Show
Agent
JPH Architects Ltd

How this decision compares

Decided in 38 days from validation, 17 days faster than Flintshire's median of 55 for full applications. Approved, as 89% of full applications here are.

63%decided within 8 weeks
89%approved
503decided in the last year

Plota live figures for full applications decided by Flintshire in the last twelve months, from validation. Flintshire decision record →

Consultation & key dates

Alt. reference
PP-14049882
Comments by
9 Sept 2025
Site or press notice
19 Aug 2025

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.