29 Glendermott Road, Waterside, Londonderry, BT47 6BG Data via plota.co.uk

LA11/2026/0783/F - Full Consultation Open

Proposal

Proposed Conveyor Car Wash And Drive Thru Coffee Shop, Valeting Bays, EV Charging Points and Car Parking And Associated Site Works And Landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
✓
Validated
3 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 3 Feb 2027 and 12 Mar 2027, from Derry and Strabane's recent full applications.

Documents 31

All documents on the council site ↗

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Derry and Strabane - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
BT47 6BG
Received
26 Oct 2026
Validated
3 Nov 2026
Ward
Ebrington
Applicant
Show
Agent
Clarman Architects

Decision outlook

Day 8 of the 56-day target. Derry and Strabane usually decides full applications by day 109.

Day 8101 days to the predicted decision (day 109)
20%decided within 8 weeks
98%approved
317decided in the last year

Plota live figures for full applications decided by Derry and Strabane in the last twelve months, from validation. Derry and Strabane decision record →

Consultation & key dates

Planning Portal ref
PP-15314032