Land Off Bryntywod Llangyfelach Swansea SA5 7LF Data via plota.co.uk
Proposal
Erection of battery energy storage system (BESS), associated infrastructure and engineering works - Non Material Amendment to planning permission granted 6th February 2025 to allow for: Increase in battery containers, transformer updated and its compound area reduced, rationalisation of BESS compound area fencing, extension to BESS compound and associated infrastructure changes. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. A decision is expected by 8 Dec 2026.
Documents 13
Statements & assessments 1
Plans & drawings 4
Application forms 1
Other documents 7
Associated applications 2
Part of
- AmendmentErection of battery energy storage system (BESS), associated infrastructure and engineering…This application2026/1773/NMA
Site constraints 4
Checked on 12 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Swansea - and every UK council - as a live feed, an API, or a bulk CSV export.
Important details
Public comments
No public comments yet.
Last counted 22 Nov 2026
Consultation & key dates
- Alt. reference
- PP-15231929
- Planning Portal ref
- PP-15231929
- Statutory expiry
- 8 Dec 2026
- Env. assessment
- No
Historical activity at this location
13 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Track this application
Land Off Bryntywod Llangyfelach Swansea SA5 7LF
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Land Off Bryntywod Llangyfelach Swansea SA5 7LF
Erection of battery energy storage system (BESS), associated infrastructure and engineering works
- Received
- 28 Aug 2024
- Decided
- 6 Feb 2025
- Outcome
- Approved