Morrisons Petrol Station Pentre-Chwyth Bon-Y-Maen Swansea SA1 7DF Data via plota.co.uk

2026/0924/FUL - Full Plans Being Considered

Proposal

Removal of existing jet wash bays and erection of jet wash bays, plant room, valet bay, and associated forecourt works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jun 2026
✓
Consultation
12 Aug 2026
Decision
Expected by 28 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 2 Sept 2026; it is now day 129.

The consultation period closed on 2 Sept 2026.

Site constraints 3

SSSI about 71 m away: Six Pit, Swansea Vale and White Rock
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 4; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Swansea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Swansea
Application type
Full Plans
Postcode
SA1 7DF
Received
2 Jun 2026
Validated
2 Jun 2026
Ward
Bonymaen - Area 1
Case officer
Show
Target decision
28 Aug 2026
Applicant
Show
Agent
Carney Sweeney

Decision outlook

Day 129, past the statutory target. 87% of commercial and major works in Swansea are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Oct 2026.

Day 12973 days past the 56-day target
60%decided within 8 weeks
90%approved
78decided in the last year

Plota live figures for commercial and major works decided by Swansea in the last twelve months, from validation. Swansea decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14975164
Planning Portal ref
PP-14975164
Consultation
12 Aug 2026
Comments by
2 Sept 2026
Site or press notice
9 Jun 2026
Statutory expiry
28 Jul 2026
Env. assessment
No