95 Chrysler Avenue Herne Bay Kent CT6 8EE Data via plota.co.uk

CA/26/01845 - Full Application Awaiting decision

Proposal

Single storey side and rear extensions. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 6 Nov 2026
Decision
Expected by 1 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 31 Dec 2026, from Canterbury's recent extensions.

Site constraints 6

Special protection area about 73 m away: Thanet Coast & Sandwich Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project about 554 m away: Kentish Flats Extension
The site is about 554 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
SSSI about 73 m away: Thanet Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Herne Bay built-up area; Priority habitat about 33 m away: Maritime cliff and slope.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £212,000 in January 2005. Detached house, freehold.

7 January 2005£212,000
15 September 1999£56,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Canterbury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Canterbury
Application type
Full Application
Postcode
CT6 8EE
Received
around 6 Nov 2026
Validated
6 Nov 2026
Ward
West Bay
Case officer
Show
Target decision
1 Jan 2027
Applicant
Show

Decision outlook

Day 17 of the 56-day target. Canterbury usually decides extensions by day 55.

Day 1739 days to the 56-day target
70%decided within 8 weeks
98%approved
487decided in the last year

Plota live figures for extensions decided by Canterbury in the last twelve months, from validation. Canterbury decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
1 Jan 2027
Canterbury
Planning Authority Score
4.8/10
Below average
#158 of 296 overall
Relevant to this application:
Householder decisions

Canterbury is slower than most councils at deciding householder applications: #259 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Canterbury decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #18 of 296
97%
Householder approved
Above avg (90%) #27 of 296
43%
Decided in 8 weeks
Below avg (63%) #259 of 296
44%
Extended time limit
Above avg (41%) #176 of 296
84%
Minor dwellings approved
62 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
93%
Change of use approved
29 decided
925
Total decisions
45 refused in the year to March 2026