Land At Polly Steps Teignmouth Data via plota.co.uk

26/01020/FUL - Full Planning Application Pending Decision

Proposal

Construction of a boathouse and associated facilities for River Teign Rowing Club Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jun 2026
✓
Validated
14 Sept 2026
Decision
Target date was 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 70.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 13 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Flood defence 5 m away (quay, designed for a 1 in 99 year flood); Inside the Teignmouth built-up area; Priority habitat 9 m away: Mudflats.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Teignbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Received
23 Jun 2026
Validated
14 Sept 2026
Ward
Teignmouth West
Parish
TEIGNMOUTH
Case officer
Show
Target decision
9 Nov 2026
Applicant
Show
Agent
MJS Planning & Design Ltd

Decision outlook

Day 70, past the statutory target. 95% of extensions in Teignbridge are decided within thirteen weeks, which runs to 14 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 7014 days past the 56-day target
90%decided within 8 weeks
86%approved
372decided in the last year

Plota live figures for extensions decided by Teignbridge in the last twelve months, from validation. Teignbridge decision record →

Public comments

16comments received
1 objecting15 supporting

94% support · above the UK average of 16%

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15007636
Planning Portal ref
PP-15007636
Statutory expiry
9 Nov 2026
Env. assessment
No
Teignbridge
Planning Authority Score
6.1/10
Average
#102 of 296 overall
Relevant to this application:
Householder decisions

Teignbridge is faster than most councils at deciding householder applications: #39 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Teignbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Teignbridge decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #262 of 296
82%
Householder approved
Below avg (90%) #270 of 296
80%
Decided in 8 weeks
Above avg (63%) #39 of 296
26%
Extended time limit
Below avg (41%) #37 of 296
60%
Minor dwellings approved
83 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
13 decided
716
Total decisions
141 refused in the year to March 2026