Glebe Farm, Horsegate Field Road, Goxhill, DN19 7NN Data via plota.co.uk

PA/2026/258 - Householder planning permission Approved

Proposal

Planning permission to erect first floor balcony Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 9 Mar 2026
✓
Approved
20 Apr 2026

Approved on 20 Apr 2026 · Last checked 24 Sept 2026

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 875 m away: River Humber Gas Pipeline Replacement Project
The site is 875 m from the project boundary. Gas pipeline, decided. The project page says whether consent was granted. Also within 2 km: Humber Carbon Capture Pipeline (at pre-application, 871 m); Humber Hydrogen Pipeline (at pre-application, 891 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area424 m² (4,564 sq ft)
Energy ratingD (57 out of 100)
PropertyDetached house, 9 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, oil
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in July 2010, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in North Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder planning permission
Postcode
DN19 7NN
Received
around 9 Mar 2026
Validated
9 Mar 2026
Ward
Ferry
Parish
Goxhill
Case officer
Show
Decision
Approve with Conditions
Decision date
20 Apr 2026

How this decision compares

Decided in 42 days from validation, 7 days faster than North Lincs's median of 49 for extensions. Approved, as 96% of extensions here are.

77%decided within 8 weeks
96%approved
212decided in the last year

Plota live figures for extensions decided by North Lincs in the last twelve months, from validation. North Lincs decision record →

Consultation & key dates

Comments by
2 Apr 2026
North Lincs
Planning Authority Score
4.6/10
Below average
#169 of 296 councils
Relevant to this application:
Householder decisions

North Lincs ranks #123 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Lincs decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #195 of 296
91%
Householder approved
Above avg (90%) #177 of 296
70%
Decided in 8 weeks
Above avg (63%) #123 of 296
44%
Extended time limit
Above avg (41%) #182 of 296
70%
Minor dwellings approved
114 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
78%
Change of use approved
37 decided
705
Total decisions
96 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.