Renault London West Site Of Renault Retail Group Ltd Western Avenue Acton W3 0RZ Data via plota.co.uk

264170OPDCOB - OPDC Consultation by Other Boroughs Pending Consideration

Proposal

Partial discharge of condition 5 (Materials - data centre building only) pursuant to planning permission reference dated 20/12/2024 for 'Section 73 application to vary Conditions 2 (approved plans and documents), 3 (development parameters), 5 (contaminated land site investigation), 6 (Construction and Environmental Management Plan), 7 (Construction Logistics Plan), 8 (circular economy details), 10 (Secured by Design), 11 (hard and soft landscaping), 12 (cycle parking), 13 (Fire Strategy), 19 (external lighting), 20 (green roofs), 21 (vehicular access), 22 (car parking implementation), 27 (vehicular access restriction), and 30 (energy statement) of planning permission for 'Redevelopment of the site to provide a data centre (Use Class B8) with associated energy and electrical infrastructure, visitor reception building, security gatehouse, plant, boundary enclosures, car and cycle parking, hard and soft landscaping; and associated alterations to vehicular access arrangements including creation of new access from Concord Road and new access from Western Avenue service road; and associated external works.' Amendments are proposed primarily to replace the approved sub-station/ancillary office building with a standalone sub station building, and to increase the size of the pocket park ( out of borough) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
13 Nov 2026
Decision
Expected by 3 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 3 Dec 2026.

Site constraints 5

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
OPDC Consultation by Other Boroughs
Postcode
W3 0RZ
Received
13 Nov 2026
Validated
13 Nov 2026
Ward
North Acton
Target decision
3 Dec 2026

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
3 Dec 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026