D T Industries Coulman Road Thorne Doncaster DN8 5JU Data via plota.co.uk

26/01531/FULM - Planning FULL Major Awaiting decision

Proposal

Erection of warehouse following demolition of the existing building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Aug 2026
✓
Validated
18 Sept 2026
✓
Consultation
30 Sept 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 13 Nov 2026, from Doncaster's recent commercial and major works.

Comments are open until 29 Oct 2026

Comment on this application ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 268 m away: Tween Bridge Solar Farm
The site is 268 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Humberhead Levels; Coalfield, development low risk area; Inside the Thorne built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area3,013 m² (32,432 sq ft)
Energy ratingE (asset rating 105)
UseB2 to B7 General Industrial and Special Industrial Groups
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
Planning FULL Major
Postcode
DN8 5JU
Received
13 Aug 2026
Validated
18 Sept 2026
Ward
Thorne And Moorends
Parish
Thorne Town Council
Case officer
Show
Target decision
18 Dec 2026
Applicant
Show
Agent
Barraton Design Studio

Decision outlook

Day 21 of the 56-day target. Doncaster usually decides commercial and major works by day 56.

Day 2135 days to the 56-day target
55%decided within 8 weeks
78%approved
66decided in the last year

Plota live figures for commercial and major works decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15117835
Planning Portal ref
PP-15117835
Neighbours
30 Sept 2026
Consultation
30 Sept 2026
Comments by
29 Oct 2026
Site or press notice
8 Oct 2026
Statutory expiry
18 Dec 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 councils
Relevant to this application:
Major dwellings

Doncaster is one of the fastest councils in England for householder decisions, ranking #27 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.