Princess Royal Barracks Brunswick Road Deepcut Camberley Surrey Data via plota.co.uk

26/0750/ADV - Advert Approved

Proposal

Display 3 sets of internally illuminated letters (two on south elevation and one on west elevation), one freestanding internally illuminated totem sign (3.5m high), 2 non illuminated wall mounted banner signs (two on south elevation of building), two non illuminated poster cases on delivery entrance wall, six non illuminated window graphics, one set of non illuminated bike shelter graphics, 4 non illuminated disclaimer signs, one courier collections window graphic, one freestanding service area sign and two non illuminated blue badge post mounted signs in respect of Phase 5i (the foodstore) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Aug 2026
✓
Validated
4 Sept 2026
✓
Consultation
4 Sept 2026
✓
Approved
29 Oct 2026

Approved on 29 Oct 2026 · Last checked 29 Oct 2026

Documents 26

All documents on the council site ↗

Site constraints 2

National infrastructure project 765 m away: Southampton to London Pipeline Project
The site is 765 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Deepcut built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Surrey Heath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advert
Received
18 Aug 2026
Validated
4 Sept 2026
Ward
Mytchett & Deepcut
Case officer
Show
Target decision
30 Oct 2026
Decision
Grant
Decision date
29 Oct 2026
Applicant
Show
Agent
Whittam Cox Architects

How this decision compares

Decided in 55 days from validation, about the council's usual 56 days. Approved, as 84% of signs and adverts here are.

53%decided within 8 weeks
84%approved
34decided in the last year

Plota live figures for signs and adverts decided by Surrey Heath in the last twelve months, from validation. Surrey Heath decision record →

Public comments

No public comments yet.

21 neighbours consulted · Last counted 29 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15116411
Planning Portal ref
PP-15116411
Neighbours
8 Sept 2026
Consultation
4 Sept 2026
Comments by
6 Oct 2026
Statutory expiry
30 Oct 2026
Env. assessment
No
Surrey Heath
Planning Authority Score
4.8/10
Below average
#163 of 296 overall
Relevant to this application:
Other decisions

Surrey Heath is #134 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Surrey Heath decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #182 of 296
87%
Householder approved
Below avg (90%) #235 of 296
68%
Decided in 8 weeks
Above avg (63%) #134 of 296
34%
Extended time limit
Below avg (41%) #94 of 296
74%
Minor dwellings approved
39 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
95%
Change of use approved
20 decided
600
Total decisions
78 refused in the year to March 2026