Ruthven Sub-Station Aboyne To Ballater AB34 5LT Data via plota.co.uk

ENQ/2026/2018 - EIA Screening Request Awaiting decision

Proposal

Erection of Electricity Substation and Associated Works, Erection of 33kV Switching Station and Associated Works, Installation of 33kV and 11kV Underground Cables, Formation of Access and Hardstanding and Ancillary Infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Nov 2026
✓
Validated
12 Nov 2026
Decision
Expected by 2 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 8 Jan 2027 and 15 Jan 2027, from Aberdeenshire's recent utility and infrastructure works.

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Aberdeenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
EIA Screening Request
Postcode
AB34 5LT
Received
10 Nov 2026
Validated
12 Nov 2026
Ward
Aboyne, Upper Deeside And Donside
Parish
Mid Deeside
Target decision
2 Dec 2026
Applicant
Show
Agent
Blackhall Powis

Decision outlook

Day 6 of the 56-day target. Aberdeenshire usually decides utility and infrastructure works by day 60.

Day 654 days to the predicted decision (day 60)
34%decided within 8 weeks
100%approved
66decided in the last year

Plota live figures for utility and infrastructure works decided by Aberdeenshire in the last twelve months, from validation. Aberdeenshire decision record →

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
2 Dec 2026
Env. assessment
No