K V Substation Hams Lane, Lea Marston, B76 0BZ Data via plota.co.uk

PAP/2025/0140 - Full Planning Application Approved

Proposal

Construction of a temporary access to facilitate the construction of National Grids Electricity Transmission Control centre building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Mar 2025
✓
Approved
13 Oct 2025

Approved on 13 Oct 2025 · Delegated · Last checked 16 Oct 2026

Site constraints 4

Green belt
Article 4 direction
Borough wide. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Green beltCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Inside the Coleshill (North Warwickshire) built-up area; National infrastructure project about 1.1 km away: The Grand Union Canal Transfer, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Warwickshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
B76 0BZ
Received
27 Mar 2025
Validated
27 Mar 2025
Case officer
Show
Target decision
13 Oct 2025
Decision
Granted Subject to Conditions
Decision date
13 Oct 2025
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 200 days from validation, 88 days slower than North Warwickshire's median of 112 for full applications. Approved, as 97% of full applications here are.

15%decided within 8 weeks
97%approved
15%go to committee

Plota live figures for full applications decided by North Warwickshire in the last twelve months, from validation. North Warwickshire decision record →

Public comments

No public comments yet.

Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
27 Sept 2025
Statutory expiry
22 May 2025
North Warwickshire
Planning Authority Score
3.9/10
Below average
#199 of 296 overall
Relevant to this application:
Householder decisions

North Warwickshire is slower than most councils at deciding householder applications: #246 of 296 on speed. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
North Warwickshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #63 of 296
97%
Householder approved
Above avg (90%) #37 of 296
48%
Decided in 8 weeks
Below avg (63%) #246 of 296
57%
Extended time limit
Above avg (41%) #258 of 296
84%
Minor dwellings approved
63 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
88%
Change of use approved
26 decided
368
Total decisions
24 refused in the year to March 2026