Ascot Stud Farm, Forest Road, Ascot, SL5 8RY Data via plota.co.uk

PA/2026/0819 - Tree Work Application (TRTPO Application) Under Consultation

Proposal

TPO 176 - Application to fell 1 tree and prune 1 tree Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
26 Aug 2026
Validated
27 Aug 2026
Decision
Expected by 22 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 5 Nov 2026 and 1 Dec 2026, from Bracknell Forest's recent tree and landscaping works. Comments are open until 22 Oct 2026.

Comment on this application ↗

Site constraints 3

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bracknell Forest - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Work Application (TRTPO Application)
Postcode
SL5 8RY
Received
26 Aug 2026
Validated
27 Aug 2026
Ward
Winkfield and Warfield East
Parish
Winkfield Parish Council
Case officer
Show
Target decision
22 Oct 2026
Decision level
Delegated Decision
Agent
Mandy Denning

Decision outlook

Day 16 of the 56-day target. Bracknell Forest usually decides tree and landscaping works by day 86.

Day 1670 days to the predicted decision (day 86)
30%decided within 8 weeks
76%approved
67decided in the last year

Plota live figures for tree and landscaping works decided by Bracknell Forest in the last twelve months, from validation. Bracknell Forest decision record →

Public comments

No public comments yet.

Last counted 11 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
22 Oct 2026
Bracknell Forest
Planning Authority Score
2.4/10
Poor
#254 of 296 councils
Relevant to this application:
Householder decisions

Bracknell Forest is one of the slowest councils in England for householder decisions, ranking #269 out of 296. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bracknell Forest decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #125 of 296
92%
Householder approved
Above avg (90%) #147 of 296
38%
Decided in 8 weeks
Below avg (63%) #269 of 296
59%
Extended time limit
Above avg (41%) #263 of 296
81%
Minor dwellings approved
26 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
83%
Change of use approved
30 decided
502
Total decisions
53 refused in the year to March 2026