Morrisons James Watt Way Erith Kent DA8 2AH Data via plota.co.uk

26/00112/ADV - Advertisement Consent Application Approved

Proposal

Display of internally illuminated EV pole sign. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jan 2026
✓
Validated
22 Jan 2026
✓
Consultation
17 Mar 2026
✓
Approved
17 Mar 2026

Approved on 17 Mar 2026 · Delegated · Last checked 25 Jul 2026

Licence at this address

  • Licence Morrisons Premises licence · in force Hours not given on the register

Licensed hours are what the licence permits, not opening times.

Site constraints 9

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Bexley AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 153 m away: Riverside Energy Park
The site is 153 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Erith
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Inside the Bexley built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bexley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bexley
Application type
Advertisement Consent Application
Postcode
DA8 2AH
Received
20 Jan 2026
Validated
22 Jan 2026
Ward
ERITH
Case officer
Show
Target decision
19 Mar 2026
Decision
Permission Granted with Conditions
Decision date
17 Mar 2026
Decision level
Delegated

How this decision compares

Decided in 54 days from validation, about the council's usual 55 days. Approved, as 88% of utility and infrastructure works here are.

88%decided within 8 weeks
88%approved
26decided in the last year

Plota live figures for utility and infrastructure works decided by Bexley in the last twelve months, from validation. Bexley decision record →

Consultation & key dates

Alt. reference
PP-14637228
Planning Portal ref
PP-14637228
Neighbours
27 Jan 2026
Consultation
17 Mar 2026
Comments by
17 Feb 2026
Statutory expiry
19 Mar 2026
Env. assessment
No
Bexley
Planning Authority Score
8.9/10
Excellent
#5 of 296 overall
Relevant to this application:
Other decisions

Bexley is one of the fastest councils in England for householder decisions: #17 of 296 on speed. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bexley decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #106 of 296
95%
Householder approved
Above avg (90%) #69 of 296
89%
Decided in 8 weeks
Above avg (63%) #17 of 296
20%
Extended time limit
Below avg (41%) #17 of 296
69%
Minor dwellings approved
124 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
58%
Change of use approved
90 decided
1,324
Total decisions
133 refused in the year to March 2026