Booth Farm,Washgate Lane,Hollinsclough, Data via plota.co.uk

NP/HPK/0926/0878 - Full Planning Permission REGISTERED: Under Consultation

Proposal

Change of use of the land from agricultural use to land used in connection with two holiday letting units. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 7 Sept 2026
✓
Validated
29 Sept 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 20 Nov 2026 and 2 Dec 2026, from Peak District's recent changes of use.

Comments are open until 30 Oct 2026

Comment on this application ↗

Site constraints 4

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area78 m² (840 sq ft)
Energy ratingC (72 out of 100)
PropertySemi-detached flat, 3 habitable rooms
Built1950 to 1966
HeatingElectric storage heaters
WallsCavity wall, filled cavity

From the energy performance certificate lodged in August 2014, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
SK17 0RP
Received
around 7 Sept 2026
Validated
29 Sept 2026
Parish
Hartington Upper Quarter
Case officer
Show
Applicant
Show

Decision outlook

Day 31 of the 56-day target. Peak District usually decides changes of use by day 53.

Day 3125 days to the 56-day target
56%decided within 8 weeks
75%approved
41decided in the last year

Plota live figures for changes of use decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
1 Oct 2026
Comments by
30 Oct 2026
Statutory expiry
23 Nov 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.