Chestnut Farm Moor End Acaster Malbis York YO23 2UQ Data via plota.co.uk

25/02393/NONMAT - Non Material Amendments Approved

Proposal

Non-material amendment to permitted application for the addition of 1no. dormer to rear elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Dec 2025
✓
Approved
9 Feb 2026

Approved on 9 Feb 2026 · Delegated Decision · Last checked 3 Oct 2026

Associated applications 3

  • Part of

    FullApprovedcouncil archive

    Conditions 4, 6 discharged

    • AmendmentNon-material amendment to permitted for the addition of 1no. dormer to rear elevationThis application25/02393/NONMAT
    • Show 1 more · 1 approved

Site constraints 8

Green belt: York
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 12 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 140 m away: Church Ings SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Coalfield, development low risk area; Inside the Acaster Malbis built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in York - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
York
Application type
Non Material Amendments
Postcode
YO23 2UQ
Received
1 Dec 2025
Validated
1 Dec 2025
Ward
Bishopthorpe
Parish
Acaster Malbis Parish Council
Case officer
Show
Target decision
29 Dec 2025
Decision
Approve
Decision date
9 Feb 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Will Slack Design

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14513933
Planning Portal ref
PP-14513933
Statutory expiry
29 Dec 2025
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Householder decisions

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026