O/s 7 Manor Close Baston Lincolnshire PE6 9PH Data via plota.co.uk

Awaiting decision S26/1042
Date received
17 Jun 2026
Date validated
17 Jun 2026
Postcode
PE6 9PH

Description

Telecoms Notification Data via plota.co.uk

Last checked

Decision outlook

Plota predicted a decision around 9 Oct 2026; it is now day 114.

Day 114, past the statutory target. 57% of full applications in South Kesteven are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 24 Aug 2026.

Day 11458 days past the 56-day target
17%decided within 8 weeks
82%approved
10%go to committee

Plota live figures for full applications decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Site constraints 3

Also on the record
2 listed buildings within 150 m of the postcode pin; Inside the Baston built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 councils
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications, ranking #262 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026