56 Meadow Park, Bathford, Bath, Bath And North East Somerset, BA1 7PY Data via plota.co.uk

26/03671/FUL - Full Application Pending Decision

Proposal

Renovation and extension to the existing balcony Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Sept 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 61.

Site constraints 4

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National landscape about 133 m away: Cotswolds; Radon affected area, class 4; Inside the Batheaston built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Full Application
Postcode
BA1 7PY
Received
23 Sept 2026
Validated
23 Sept 2026
Ward
Bathavon North
Parish
Bathford
Case officer
Show
Target decision
25 Nov 2026
Applicant
Show

Decision outlook

Day 61, past the statutory target. 82% of extensions in Bath are decided within thirteen weeks, which runs to 23 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 615 days past the 56-day target
60%decided within 8 weeks
98%approved
811decided in the last year

Plota live figures for extensions decided by Bath in the last twelve months, from validation. Bath decision record →

Consultation & key dates

Planning Portal ref
PP-15242303
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 overall
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications: #236 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026