Spire Portsmouth Hospital, SPIRE PORTSMOUTH HOSPITAL, Havant, PO9 5NP Data via plota.co.uk

EHDC-26-0998-FUL - Full Planning Application Pending Consideration

Proposal

Installation of Air Handling Unit (AHU), Roof Dormer, Ductwork and Condensing Unit Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2026
Decision
Target date was 29 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 3 Dec 2026, from East Hampshire's recent extensions.

The consultation period closed on 12 Oct 2026.

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; National infrastructure project 1.8 km away: Hampshire Water Transfer and Water Recycling Project; Inside the Havant built-up area; Priority habitat 33 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area4,535 m² (48,814 sq ft)
Energy ratingC (asset rating 53)
UseResidential Institutions: Hospitals and Care Homes
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in April 2023, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
PO9 5NP
Received
3 Sept 2026
Validated
3 Sept 2026
Ward
Rowlands Castle
Parish
Rowlands Castle CP
Case officer
Show
Target decision
29 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
NWS Planning

Decision outlook

Day 81, past the statutory target. 60% of extensions in East Hampshire are decided within thirteen weeks, which runs to 3 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 8125 days past the 56-day target
32%decided within 8 weeks
92%approved
471decided in the last year

Plota live figures for extensions decided by East Hampshire in the last twelve months, from validation. East Hampshire decision record →

Consultation & key dates

Comments by
12 Oct 2026
Statutory expiry
29 Oct 2026
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 overall
Relevant to this application:
Householder decisions

East Hampshire is one of the slowest councils in England for householder decisions: #293 of 296 on speed. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.