Plot C6 Parc Coed Ely Land Off A4119 Coedely Tonyrefail Data via plota.co.uk

26/0955/RES - Approval of Reserved Matters Pending Decision

Proposal

Approval of reserved matters (layout, scale, appearance, landscaping and access) pursuant to planning permission for the erection of a headquarters building comprising a workshop (Use Class B2) with ancillary office and welfare accommodation, together with an electricity substation, associated parking, access arrangements, landscaping, drainage infrastructure and ancillary works at Plot C6, Parc Coed Ely. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
✓
Validated
10 Nov 2026
Decision
Expected by 5 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 5 Jan 2027 and 25 Jan 2027, from Rhondda's recent commercial and major works.

Comments are open until 4 Dec 2026

Comment on this application ↗

Documents 33

All documents on the council site ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 11 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rhondda - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rhondda
Application type
Approval of Reserved Matters
Received
4 Nov 2026
Validated
10 Nov 2026
Ward
Tonyrefail East
Case officer
Show
Target decision
5 Jan 2027
Agent
Expedite Planning Ltd

Decision outlook

Day 13 of the 56-day target. Rhondda usually decides commercial and major works by day 57.

Day 1344 days to the predicted decision (day 57)
43%decided within 8 weeks
89%approved
32%go to committee

Plota live figures for commercial and major works decided by Rhondda in the last twelve months, from validation. Rhondda decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
4 Dec 2026
Statutory expiry
5 Jan 2027
Env. assessment
No