Cottam Power Station Outgang Lane Cottam Nottinghamshire Data via plota.co.uk

26/00693/COND - Request for Condition Discharge Decided

Proposal

Application for Discharge of Requirement 4 (1) (Community Liaison Group) of the of the Cottam Solar Project Order 2024 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Jun 2026
✓
Validated
16 Jun 2026
✓
Consultation
24 Jul 2026
✓
Determined
29 Sept 2026

Determined on 29 Sept 2026 · Delegated After Referring To PCG · Last checked 30 Sept 2026

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Gate Burton Energy Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Cottam Solar Project (decided, the site is inside its boundary); Tillbridge Solar Project (decided, 18 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Cottam (Bassetlaw) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bassetlaw - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bassetlaw
Application type
Request for Condition Discharge
Received
10 Jun 2026
Validated
16 Jun 2026
Ward
Rampton
Parish
Rampton And Woodbeck
Case officer
Show
Target decision
29 Sept 2026
Decision
Determined
Decision date
29 Sept 2026
Decision level
Delegated After Referring To PCG
Applicant
Show
Agent
Lanpro Services

Public comments

No public comments yet.

Last counted 30 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
24 Jul 2026
Comments by
31 Jul 2026
Statutory expiry
11 Aug 2026
Env. assessment
No
Bassetlaw
Planning Authority Score
1.2/10
Poor
#286 of 296 overall
Relevant to this application:
Householder decisions

Bassetlaw is one of the slowest councils in England for householder decisions: #291 of 296 on speed. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bassetlaw decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #203 of 296
89%
Householder approved
Below avg (90%) #199 of 296
25%
Decided in 8 weeks
Below avg (63%) #291 of 296
73%
Extended time limit
Above avg (41%) #289 of 296
68%
Minor dwellings approved
77 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
78%
Change of use approved
45 decided
575
Total decisions
87 refused in the year to March 2026