1-3 Rawstorne Place, London, EC1V 7NL Data via plota.co.uk

P2026/2314/FUL - Full Planning Application OFFICER REVIEW

Proposal

Installation of four air conditioning external condenser units, together with associated pipework, condensate drain, acoustic enclosure and acoustic wall. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2026
✓
Validated
29 Sept 2026
✓
Consultation
8 Oct 2026
Decision
Target date was 19 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 55.

The consultation period closed on 31 Oct 2026.

Site constraints 21

Article 4 directionCritical Drainage Group3_006Bunhill & Clerkenwell Area Action PlanCAZHeathrow Safeguarding AreaCentral Activities ZoneAlexandra Palace viewing terrace to St Paul's CathedralSite within 100m of a SRN RoadNew RiverIIBA
Grade II listed: 54-61, Rawstorne Road
List entry 1208341 · 25 m away · 17 more listed buildings within 150 m (3 Grade II*, 14 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 17 with distances
Historic England ↗
New River conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Protected view corridor: 1A.2 Alexandra Palace viewing terrace to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Critical Drainage Group3_006Council record
Recorded by the council for this site.
Council site ↗
Bunhill & Clerkenwell Area Action PlanCouncil record
Recorded by the council for this site.
Council site ↗
CAZCouncil record
Recorded by the council for this site.
Council site ↗
Heathrow Safeguarding AreaCouncil record
Recorded by the council for this site.
Council site ↗
Central Activities ZoneCouncil record
Recorded by the council for this site.
Council site ↗
Alexandra Palace viewing terrace to St Paul's CathedralCouncil record
Recorded by the council for this site.
Council site ↗
Site within 100m of a SRN RoadCouncil record
Recorded by the council for this site.
Council site ↗
New RiverCouncil record
Recorded by the council for this site.
Council site ↗
IICouncil record
Recorded by the council for this site.
Council site ↗
BCouncil record
Recorded by the council for this site.
Council site ↗
ACouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
National infrastructure project 1.6 km away: Thames Tideway Tunnel; Inside the Islington built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 92 m away: Angel.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area233 m² (2,508 sq ft)
Energy ratingC (asset rating 52)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Full Planning Application
Postcode
EC1V 7NL
Received
2 Sept 2026
Validated
29 Sept 2026
Ward
St Peter's & Canalside
Case officer
Show
Target decision
19 Nov 2026
Applicant
Show
Agent
Baynes and Mitchell Architects
Leaseholder
Show

Decision outlook

Day 55, past Islington's usual 50 days for utility and infrastructure works. 87% are decided within thirteen weeks, so most likely by 29 Dec 2026.

Day 551 days to the 56-day target
68%decided within 8 weeks
78%approved
61decided in the last year

Plota live figures for utility and infrastructure works decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-15183714
Comments by
31 Oct 2026
Site or press notice
8 Oct 2026
Statutory expiry
24 Oct 2026
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 overall
Relevant to this application:
Householder decisions

Islington is slower than most councils at deciding householder applications: #260 of 296 on speed. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.