Flats A And C 106 Devonport Road London W12 8NU Data via plota.co.uk

2025/02134/FUL - Full Planning Application Approved

Proposal

Replacement of existing single glazed timber framed windows with new double glazed timber framed windows to the front elevation at ground and second floor levels; replacement of existing double glazed uPVC framed window with a new double glazed uPVC framed window at ground floor level to the side elevation; replacement of 1no existing single glazed timber framed window and 1no existing double glazed uPVC framed window with new double glazed uPVC framed windows at second floor level, replacement of 2no existing uPVC framed windows and 1no half glazed uPVC framed door with new double glazed uPVC framed windows and door at ground floor level to the rear elevation; replacement of existing roof covering from concrete interlocking grey roof tiles with new roof covering at roof level to match existing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Aug 2025
✓
Validated
11 Aug 2025
✓
Approved
6 Oct 2025

Approved on 6 Oct 2025 · Last checked 19 Oct 2026

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 805 m away: Thames Tideway Tunnel
The site is 805 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area 61 m away: Ingersoll and Arminger; 1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W12 8NU
Received
5 Aug 2025
Validated
11 Aug 2025
Ward
Coningham
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
6 Oct 2025
Applicant
Show
Freehold owner
Show

How this decision compares

Decided in 56 days from validation, 21 days faster than Hammersmith and Fulham's median of 77 for full applications. Approved, as 98% of full applications here are.

28%decided within 8 weeks
98%approved
759decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
12 Aug 2025
Comments by
6 Oct 2025
Statutory expiry
6 Oct 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.