Land Adjacent To Morland House Hungerford Lane Shurlock Row Reading Data via plota.co.uk

26/02219/OUT - Outline Awaiting decision

Proposal

Outline application for Access only to be considered at this stage with all other matters to be reserved for the construction of 8 no. dwellings. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
✓
Validated
16 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Nov 2026, from Windsor and Maidenhead's recent new homes.

Comments are open until 15 Oct 2026

Comment on this application ↗

Documents 29

Statements & assessments 20

PDF Arboricultural report Supporting Information - Arboricultural report · 17 Sept 2026 View ↗ PDF Transport statement Supporting Information - Transport · 8 Sept 2026 View ↗ PDF Sustainability & energy statement Supporting Information - General · 8 Sept 2026 View ↗ PDF Highway technical note - via solutions Supporting Information - Transport · 8 Sept 2026 View ↗ PDF Planning statement annexes Planning Statement · 8 Sept 2026 View ↗ PDF Heritage statement Heritage Statement · 8 Sept 2026 View ↗ PDF Morland house planning statement Planning Statement · 8 Sept 2026 View ↗ PDF Statement of community involvement Supporting Information - General · 8 Sept 2026 View ↗ PDF Cricket ball strike assessment Supporting Information - General · 8 Sept 2026 View ↗ PDF Five year housing land supply statement Planning Statement · 8 Sept 2026 View ↗ PDF Hungerford lane highway improvements brief 1 Supporting Information - Transport · 8 Sept 2026 View ↗ PDF Housing needs assessment Supporting Information - General · 8 Sept 2026 View ↗ PDF Road safety audit stage 1 Supporting Information - Transport · 8 Sept 2026 View ↗ PDF Drainage strategy SUDS & drainage · 8 Sept 2026 View ↗ PDF Design & access statement Design and Access Statement · 8 Sept 2026 View ↗ PDF Land supply site by site proformas v3 (compressed) Planning Statement · 8 Sept 2026 View ↗ PDF Aae covering letter Supporting Information - Ecology · 8 Sept 2026 View ↗ PDF Ecology technical note Supporting Information - Ecology · 8 Sept 2026 View ↗ PDF Hungerford lane, shurlock row - the_statutory_metric_macrodisabled_1.0.4 (1) Supporting Information - Ecology · 8 Sept 2026 View ↗ PDF Bng technical note Supporting Information - Ecology · 8 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 5

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
National infrastructure project 913 m away: M4 Junctions 3 to 12 Smart Motorway
The site is 913 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Shurlock Row built-up area; Priority habitat 27 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Windsor and Maidenhead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline
Postcode
RG10 0NY
Received
8 Sept 2026
Validated
16 Sept 2026
Ward
Hurley And Walthams
Parish
Waltham St Lawrence Parish
Target decision
10 Nov 2026
Applicant
Show

Decision outlook

Day 24 of the 56-day target. Windsor and Maidenhead usually decides new homes by day 55.

Day 2432 days to the 56-day target
70%decided within 8 weeks
53%approved
114decided in the last year

Plota live figures for new homes decided by Windsor and Maidenhead in the last twelve months, from validation. Windsor and Maidenhead decision record →

Consultation & key dates

Alt. reference
PP-15194319
Planning Portal ref
PP-15194319
Comments by
15 Oct 2026
Statutory expiry
10 Nov 2026
Env. assessment
No
Windsor and Maidenhead
Planning Authority Score
5.3/10
Average
#135 of 296 councils
Relevant to this application:
Major dwellings

Windsor and Maidenhead is faster than most councils at deciding householder applications, ranking #82 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Windsor and Maidenhead is also one of the strictest councils - it refuses more householder applications than almost any other, with only 74% approved vs 90% nationally.

One of the strictest councils
only 74% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Windsor and Maidenhead decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #293 of 296
74%
Householder approved
Below avg (90%) #294 of 296
75%
Decided in 8 weeks
Above avg (63%) #82 of 296
28%
Extended time limit
Below avg (41%) #47 of 296
44%
Minor dwellings approved
156 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
64%
Change of use approved
25 decided
1,530
Total decisions
434 refused in the year to March 2026