19 Wickham Road Church Crookham Fleet Hampshire GU52 6NX Data via plota.co.uk

26/01351/LDC - Lawful Development Certificate Approved

Proposal

Single storey rear extension following demolition of existing (proposed) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Aug 2026
✓
Approved
5 Oct 2026

Approved on 5 Oct 2026 · Delegated Decision · Last checked 5 Oct 2026

Site constraints 5

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 151 m away: Odiham Common with Bagwell Green and Shaw SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
National infrastructure project 1678 m away: Southampton to London Pipeline Project; Inside the Fleet built-up area; Conservation area 95 m away: Basingstoke Canal4.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area85 m² (915 sq ft)
Energy ratingD (61 out of 100), could reach B
PropertySemi-detached house, 3 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in August 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hart - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hart
Application type
Lawful Development Certificate
Postcode
GU52 6NX
Received
10 Aug 2026
Validated
10 Aug 2026
Ward
Fleet Central
Parish
Fleet Parish
Case officer
Show
Target decision
5 Oct 2026
Decision
Grant
Decision date
5 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
BAS Property Consultants Ltd

How this decision compares

Decided in 56 days from validation, about the council's usual 55 days. Approved, as 90% of extensions here are.

74%decided within 8 weeks
90%approved
414decided in the last year

Plota live figures for extensions decided by Hart in the last twelve months, from validation. Hart decision record →

Public comments

No public comments yet.

Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15134773
Planning Portal ref
PP-15134773
Statutory expiry
5 Oct 2026
Env. assessment
No
Hart
Planning Authority Score
4.7/10
Below average
#165 of 296 councils
Relevant to this application:
Householder decisions

Hart ranks #116 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hart decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #223 of 296
86%
Householder approved
Below avg (90%) #244 of 296
71%
Decided in 8 weeks
Above avg (63%) #116 of 296
36%
Extended time limit
Below avg (41%) #111 of 296
64%
Minor dwellings approved
45 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
81%
Change of use approved
16 decided
698
Total decisions
114 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.