Pavement Outside 1B Shepherd's Bush Road London W6 7NA Data via plota.co.uk

2025/03051/ADV - Advertisement Withdrawn

Proposal

Display of an internally illuminated digital LED screen to one side of a new free standing multifunctional hub unit, showing static and animated displays in sequence comprising commercial and community messages. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Oct 2025
✓
Validated
3 Nov 2025
−
Withdrawn
27 Aug 2026

Withdrawn on 27 Aug 2026 · Last checked 12 Oct 2026

Documents 25

Plans & drawings 23

PDF 1b Shepherds Bush Road v2 Drawing · 23 Feb 2026 View ↗ PDF APPENDIX B - COMMUNITY CHANNEL Drawing · 31 Oct 2025 View ↗ PDF APPENDIX D - REINSTATEMENT Drawing · 31 Oct 2025 View ↗ PDF APPENDIX E - MANAGEMENT PLAN Drawing · 31 Oct 2025 View ↗ PDF APPENDIX F - THE CHBT Drawing · 31 Oct 2025 View ↗ PDF APPLICATION LETTER LBHF Drawing · 31 Oct 2025 View ↗ PDF APPENDIX A - COMMS UNIT DRAWINGS Drawing · 31 Oct 2025 View ↗ PDF ELEVATION (FRONT) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF FLOOR PLAN_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF FLOOR PLAN - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF ROOF PLAN - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF SECTION - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF SECTION - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Oct 2025 View ↗ PDF SITE B - PLANS Drawing · 31 Oct 2025 View ↗ PDF LAYOUT PLAN - EXISTING_INCLUDED_IN_BLOCK PLAN OF THE SITE Drawing · 31 Oct 2025 View ↗ PDF LAYOUT PLAN - PROPOSED_INCLUDED_IN_BLOCK PLAN OF THE SITE Drawing · 31 Oct 2025 View ↗ PDF SITEBLOCK PLAN - EXISTING_INCLUDED_IN_BLOCK PLAN OF THE SITE Drawing · 31 Oct 2025 View ↗ PDF THE LOCATION PLAN_INCLUDED_IN_BLOCK PLAN OF THE SITE Drawing · 31 Oct 2025 View ↗ PDF CIL FORM SITE B Drawing · 31 Oct 2025 View ↗

All documents on the council site ↗

Site constraints 10

Shepherds Bush conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shepherds Bush Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1.1 km away: Thames Tideway Tunnel; 2 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 43 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement
Postcode
W6 7NA
Received
31 Oct 2025
Validated
3 Nov 2025
Ward
Addison
Case officer
Show
Decision date
27 Aug 2026
Applicant
Show

Consultation & key dates

Consultation
5 Nov 2025
Comments by
29 Dec 2025
Site or press notice
12 Nov 2025
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026