Milepost North West Of West Lodge Ewart Akeld Northumberland Data via plota.co.uk

26/00433/LBC - Listed Building Consent Approved

Proposal

Listed Building Consent for refurbishment of marker post Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Feb 2026
✓
Consultation
18 Feb 2026
✓
Approved
16 Mar 2026

Approved on 16 Mar 2026 · Delegated Decision · Last checked 25 Jul 2026

Site constraints 4

Grade II listed: Milepost Circa 200 Yards North of Ewart Park West Lodge
List entry 1042341 · The pin is inside its outline · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Northumberland (County) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Received
6 Feb 2026
Validated
6 Feb 2026
Ward
Wooler
Parish
Ewart
Case officer
Show
Target decision
6 Mar 2026
Decision
Application Permitted
Decision date
16 Mar 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 38 days from validation, 18 days faster than Northumberland (County)'s median of 56 for listed building works. Approved, as 90% of listed building works here are.

60%decided within 8 weeks
90%approved
284decided in the last year

Plota live figures for listed building works decided by Northumberland (County) in the last twelve months, from validation. Northumberland (County) decision record →

Consultation & key dates

Alt. reference
PP-14680144
Planning Portal ref
PP-14680144
Consultation
18 Feb 2026
Comments by
12 Mar 2026
Site or press notice
17 Feb 2026
Statutory expiry
6 Mar 2026
Env. assessment
No
Northumberland (County)
Planning Authority Score
3.8/10
Below average
#207 of 296 overall
Relevant to this application:
Other decisions

Northumberland (County) is #167 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Northumberland (County) decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #158 of 296
91%
Householder approved
Above avg (90%) #178 of 296
62%
Decided in 8 weeks
Below avg (63%) #167 of 296
47%
Extended time limit
Above avg (41%) #210 of 296
80%
Minor dwellings approved
223 decided (1-9 homes)
89%
Major dwellings approved
36 decided (10+ homes)
86%
Change of use approved
71 decided
2,013
Total decisions
233 refused in the year to March 2026