Bramble Cottage Hall Road Hethel Norfolk NR14 8HA Data via plota.co.uk

2026/2022 - Householder Approved

Proposal

Rear and side single-storey extensions. Solar panels to south and west facing roofs Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
13 Jul 2026
Consultation
17 Jul 2026
Approved
7 Sept 2026

Approved on 7 Sept 2026 · Delegated · Last checked 10 Sept 2026

Site constraints 4

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 9 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
NR14 8HA
Received
13 Jul 2026
Validated
13 Jul 2026
Ward
Mulbarton And Stoke Holy Cross
Parish
Bracon Ash And Hethel
Case officer
Show
Decision
Approval with Conditions
Decision date
7 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
NB: Architectural Technologist

How this decision compares

Decided in 56 days from validation, about the council's usual 53 days. Approved, as 95% of extensions here are.

71%decided within 8 weeks
95%approved
431decided in the last year

Plota live figures for extensions decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14930033
Neighbours
17 Jul 2026
Consultation
17 Jul 2026
Comments by
13 Aug 2026
Site or press notice
23 Jul 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026