PL/2025/01340/PNH - Prior Notification Householder Approved

Proposal

Prior notification for a ground floor rear extension measuring 7.8m beyond the original rear wall, at a maximum height of 3.9m, and measuring 2.8m at the eaves. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Jul 2025
✓
Validated
9 Jul 2025
✓
Consultation
15 Jul 2025
✓
Approved
7 Aug 2025

Approved on 7 Aug 2025 · Delegated Decision · Last checked 15 Oct 2026

Site constraints 7

Green belt: Birmingham
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Public footpath 7 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project 164 m away: M42 Junction 6 Improvement
The site is 164 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Catherine-de-Barnes built-up area; Open access land 7 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £930,000 in May 2020. Detached house, freehold.

18 May 2020£930,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area75 m² (807 sq ft)
Energy ratingE (46 out of 100), could reach C
PropertyDetached house, 4 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Solihull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Solihull
Application type
Prior Notification Householder
Postcode
B92 0DE
Received
4 Jul 2025
Validated
9 Jul 2025
Parish
Hampton In Arden Parish Council
Target decision
20 Aug 2025
Decision
Prior Approval Not Required
Decision date
7 Aug 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Hapticity Architects Ltd

How this decision compares

Decided in 29 days from validation, 7 days faster than Solihull's median of 36 for prior approvals. Approved, as 77% of prior approvals here are.

94%decided within 8 weeks
77%approved
149decided in the last year

Plota live figures for prior approvals decided by Solihull in the last twelve months, from validation. Solihull decision record →

Consultation & key dates

Alt. reference
PP-14151401
Planning Portal ref
PP-14151401
Neighbours
15 Jul 2025
Consultation
15 Jul 2025
Comments by
6 Aug 2025
Statutory expiry
20 Aug 2025
Env. assessment
No
Solihull
Planning Authority Score
5.2/10
Average
#141 of 296 overall
Relevant to this application:
Householder decisions

Solihull is #148 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Solihull decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #44 of 296
94%
Householder approved
Above avg (90%) #116 of 296
65%
Decided in 8 weeks
Above avg (63%) #148 of 296
41%
Extended time limit
Below avg (41%) #160 of 296
87%
Minor dwellings approved
53 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
90%
Change of use approved
51 decided
1,118
Total decisions
71 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.