Riverside Holiday Village Bridgwater Road Bleadon BS24 0AN Data via plota.co.uk

25/P/2470/TBCA - Temporary use Class BC Prior Approval Approved

Proposal

Prior Approval for a proposed temporary use as a recreational campsite for up to 50 tent pitches Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Nov 2025
✓
Validated
8 Dec 2025
✓
Approved
29 Jan 2026

Approved on 29 Jan 2026 · Delegated Decision · Last checked 6 Oct 2026

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
National nature reserve 266 m away: Mendip
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 248 m away: Purn Hill SSSI; Inside the Bleadon built-up area; Priority habitat 12 m away: No main habitat but additional habitats present; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Somerset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Temporary use Class BC Prior Approval
Postcode
BS24 0AN
Received
28 Nov 2025
Validated
8 Dec 2025
Ward
Hutton And Locking
Parish
Bleadon
Case officer
Show
Target decision
2 Feb 2026
Decision
Prior approval - grant
Decision date
29 Jan 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Shattock Associates

How this decision compares

Decided in 52 days from validation, 24 days slower than North Somerset's median of 28 for prior approvals. Approved, as 93% of prior approvals here are.

88%decided within 8 weeks
93%approved
214decided in the last year

Plota live figures for prior approvals decided by North Somerset in the last twelve months, from validation. North Somerset decision record →

Public comments

1comment received
1 supporting

19 neighbours consulted · Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
10 Jan 2026
Statutory expiry
2 Feb 2026
Env. assessment
No
North Somerset
Planning Authority Score
6.4/10
Average
#83 of 296 overall
Relevant to this application:
Householder decisions

North Somerset is faster than most councils at deciding householder applications: #96 of 296 on speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
North Somerset decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #137 of 296
93%
Householder approved
Above avg (90%) #134 of 296
73%
Decided in 8 weeks
Above avg (63%) #96 of 296
34%
Extended time limit
Below avg (41%) #88 of 296
74%
Minor dwellings approved
135 decided (1-9 homes)
95%
Major dwellings approved
19 decided (10+ homes)
85%
Change of use approved
52 decided
1,139
Total decisions
128 refused in the year to March 2026