22 - 30 Sturt Road Frimley Green Camberley Surrey Data via plota.co.uk

25/1179/DTC - Details to comply Approved

Proposal

Submission of details pursuant to Conditions 11 (bus stops) and 14 (construction management plan) of [relating to the erection of a residential development of 160 dwellings, including the conversion of the pumphouse building into residential dwellings, to provide 36 no one bedroom and 48 no two bedroom flats; 30 no two bedroom, 37 no three bedroom and 9 no four bedroom houses, along with associated estate roads and accesses onto Sturt Road, car parking, bin and cycle storage, local area of play and external landscaping following the demolition of all other buildings]. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Nov 2025
✓
Consultation
6 Jan 2026
✓
Approved
25 Mar 2026

Approved on 25 Mar 2026 · Delegated Decision · Last checked 9 Oct 2026

Associated applications 6

Site constraints 4

National infrastructure project 302 m away: Southampton to London Pipeline Project
The site is 302 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
1 listed building within 150 m
Nearest: Church of St Andrew, Grade II, 35 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
SSSI 464 m away: Odiham Common with Bagwell Green and Shaw SSSI; Inside the Frimley built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Surrey Heath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Details to comply
Received
7 Nov 2025
Validated
7 Nov 2025
Ward
Frimley Green
Case officer
Show
Target decision
20 Mar 2026
Decision
Grant
Decision date
25 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Square One Planning Ltd

Public comments

No public comments yet.

Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14471500
Planning Portal ref
PP-14471500
Consultation
6 Jan 2026
Comments by
3 Feb 2026
Statutory expiry
2 Jan 2026
Env. assessment
No
Surrey Heath
Planning Authority Score
4.8/10
Below average
#163 of 296 overall
Relevant to this application:
Major dwellings

Surrey Heath is #134 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Surrey Heath decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #182 of 296
87%
Householder approved
Below avg (90%) #235 of 296
68%
Decided in 8 weeks
Above avg (63%) #134 of 296
34%
Extended time limit
Below avg (41%) #94 of 296
74%
Minor dwellings approved
39 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
95%
Change of use approved
20 decided
600
Total decisions
78 refused in the year to March 2026