1 Victoria Street London SW1H 0ET Data via plota.co.uk

25/09079/NMA - Non-material amendments Approved

Proposal

Amendments to planning permission dated 08th November 2024 (RN ) for 'Retention of two storey basement and demolition of existing building above ground level. Construction to provide a building comprising retained basement, ground and nine upper floors for use as retail, restaurant, leisure/experience, medical (Class E (a) (b) (c) (d) (e)) and office (Class E(g)(i)) uses together with associated ancillary spaces to those uses. Provision of public realm enhancements, including new landscaping. Provision of short and long stay cycle parking, on-site servicing, refuse storage, plant and other ancillary and associated works'. Namely reduction in photovoltaics, landscape re-design at junction of Victoria Street and Great Smith Street, changes to Victoria Street elevation materials and internal adjustments to the basement cycle store layout. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Dec 2025
✓
Approved
30 Apr 2026

Approved on 30 Apr 2026 · Delegated Decision · Last checked 3 Oct 2026

Documents 49

Plans & drawings 40

PDF PROPOSED EAST & NORTH-EAST ELEVATION Drawing · 24 Apr 2026 View ↗ PDF PROPOSED SOUTH ELEVATION Drawing · 24 Apr 2026 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 24 Apr 2026 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 24 Apr 2026 View ↗ PDF PROPOSED ROOF PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED LOWER GROUND FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED BASEMENT LEVEL 3 PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED BASEMENT LEVEL 2 PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED BASEMENT LEVEL 1 PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED NINTH FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED EIGHTH FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED SEVENTH FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED SIXTH FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED FIFTH FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED FOURTH FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED THIRD FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED SECOND FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED FIRST FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN Drawing · 24 Apr 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED FIRST FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED SECOND FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED THIRD FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED FOURTH FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED FIFTH FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED SIXTH FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED SEVENTH FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED EIGHTH FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED NINTH FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED BASEMENT LEVEL 1 PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED BASEMENT LEVEL 2 PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED BASEMENT LEVEL 3 PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED LOWER GROUND FLOOR PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED ROOF PLAN Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED NORTH ELEVATION Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED WEST ELEVATION Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED SOUTH ELEVATION Superseded document · 15 Dec 2025 View ↗ PDF PROPOSED EAST & NORTH-EAST ELEVATION Superseded document · 15 Dec 2025 View ↗ PDF PLANNING DRAWING REGISTER Drawing · 15 Dec 2025 View ↗ PDF SITE LOCATION PLAN Drawing · 15 Dec 2025 View ↗

All documents on the council site ↗

Associated applications 9

Site constraints 14

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Article 4 Basement Development Permitted Rights Removed. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 2.8
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 345 m away: Thames Tideway Tunnel
The site is 345 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 501 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
World heritage site 80 m away: Palace of Westminster, Westminster Abbey and St. Margaret's Church
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
12 listed buildings within 150 m
Nearest: Orchard House, Grade II, 54 m away · 1 Grade II*, 11 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 12 with distances
Historic England ↗
Also on the record
Conservation area 47 m away: Peabody Estates: South Westminster; Scheduled monument 238 m away: The Chapter House and Pyx Chamber in the abbey cloisters, Westminster Abbey; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 69 m away: Victoria Street.
Not affected
Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendments
Postcode
SW1H 0ET
Received
15 Dec 2025
Validated
15 Dec 2025
Ward
St James's
Case officer
Show
Target decision
12 Jan 2026
Decision
Application Permitted
Decision date
30 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Newmark

How this decision compares

Decided in 136 days from validation, 83 days slower than Westminster's median of 53 for amendments. Approved, as 90% of amendments here are.

56%decided within 8 weeks
90%approved
433decided in the last year

Plota live figures for amendments decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14565524
Planning Portal ref
PP-14565524
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026