Pavement Outside 271-275 Bethnal Green Road, London, E2 Data via plota.co.uk

PA/26/01627/NC - Full Planning Permission Registered

Proposal

The installation of one JOLT Unit (Electric Vehicle Charge Point, with integral double-sided LCD screen) and associated electrical connection works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 22 Sept 2026
✓
Consultation
6 Oct 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 17 Nov 2026, from Tower Hamlets's recent utility and infrastructure works.

Comments are open until 27 Oct 2026

Comment on this application ↗

Site constraints 8

Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Bethnal Green
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Wider setting of protected view 25A.1 City Hall to the White Tower; National infrastructure project 1624 m away: Thames Tideway Tunnel; 1 listed building within 150 m; Inside the Tower Hamlets built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E2 6AH
Received
around 22 Sept 2026
Validated
22 Sept 2026
Ward
Weavers
Case officer
Show
Target decision
24 Nov 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 17 of the 56-day target. Tower Hamlets usually decides utility and infrastructure works by day 56.

Day 1739 days to the 56-day target
67%decided within 8 weeks
85%approved
48decided in the last year

Plota live figures for utility and infrastructure works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
6 Oct 2026
Consultation
6 Oct 2026
Comments by
27 Oct 2026
Statutory expiry
24 Nov 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026