Queens Gardens Queens Dock Avenue Kingston Upon Hull HU1 3DJ Data via plota.co.uk

25/00568/NMA - Non material amendment Approved

Proposal

Non material amendment for - Engineering works including the demolition and/or removal of walls, ramps, steps, railings, lighting, street furniture and other features, hard surfacing, and kerbs and edging. The construction of new walls, ramps, steps, terracing, railings, lighting columns including c15m high feature columns, street furniture, and other features including interpretation and public art, hard surfacing, kerbs and edging, and drainage works, and levelling of sunken peace garden. Soft landscaping including the removal and planting of trees to include new attenuation tree pits Demolition of existing cafe building and erection of combined electricity sub-station, switch room, and gardener's store. (AMENDED PLANS) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jun 2025
✓
Approved
30 Jul 2025

Approved on 30 Jul 2025 · Delegated Decision · Last checked 18 Oct 2026

Associated applications 5

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 251 m away: A63 Castle Street Improvement-Hull
The site is 251 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
24 listed buildings within 150 m; Scheduled monument 219 m away: Beverley Gate and adjacent archaeological remains forming part of Hull's medieval and post-medieval defences; Conservation area 65 m away: Old Town; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Non material amendment
Postcode
HU1 3DJ
Received
23 Jun 2025
Validated
23 Jun 2025
Ward
St Andrews And Dockland
Case officer
Show
Decision
NMA Approved
Decision date
30 Jul 2025
Decision level
Delegated Decision
Agent
Purcell

Public comments

No public comments yet.

Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14078165
Planning Portal ref
PP-14078165
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026