Land Between 12 & 13 Broxburn Close Wallsend Tyne And Wear Data via plota.co.uk

26/01573/ECREG5 - Electronic Communications Reg 5 Approved

Proposal

Installation of 9m pole Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2026
✓
Approved
19 Nov 2026

Approved on 19 Nov 2026 · Delegated Decision · Last checked 21 Nov 2026

Site constraints 3

National infrastructure project 621 m away: A19/A1058 Coast Road Junction Improvement
The site is 621 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; Inside the Wallsend built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Electronic Communications Reg 5
Received
6 Nov 2026
Validated
6 Nov 2026
Ward
Battle Hill
Parish
Wallsend
Case officer
Show
Target decision
4 Dec 2026
Decision
No Objection under Electronic Comm Code
Decision date
19 Nov 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 13 days from validation, 5 days faster than North Tyneside's median of 18 for utility and infrastructure works. Approved, as 78% of utility and infrastructure works here are.

92%decided within 8 weeks
78%approved
143decided in the last year

Plota live figures for utility and infrastructure works decided by North Tyneside in the last twelve months, from validation. North Tyneside decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
4 Dec 2026
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 overall
Relevant to this application:
Householder decisions

North Tyneside is faster than most councils at deciding householder applications: #35 of 296 on speed. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026