Land Rear Of 5 - 15 The Coppice Burbage Leicestershire Data via plota.co.uk

25/01101/FUL - Full Application Awaiting decision

Proposal

Erection of a custom build bungalow and detached garage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Nov 2025
Decision
Target date was 12 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 371.

The consultation period closed on 27 Dec 2025.

Documents 35

All documents on the council site ↗

Site constraints 4

National infrastructure project about 139 m away: Hinckley National Rail Freight Interchange
The site is about 139 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Hinckley built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hinckley and Bosworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
17 Nov 2025
Validated
17 Nov 2025
Ward
Burbage St Catherines & Lash Hill
Parish
Burbage Parish Council
Case officer
Show
Target decision
12 Jan 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Hayward Architects Ltd

Decision outlook

Day 371, past the statutory target. 52% of full applications in Hinckley and Bosworth are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 371315 days past the 56-day target
16%decided within 8 weeks
90%approved
164decided in the last year

Plota live figures for full applications decided by Hinckley and Bosworth in the last twelve months, from validation. Hinckley and Bosworth decision record →

Consultation & key dates

Alt. reference
PP-14469635
Planning Portal ref
PP-14469635
Comments by
27 Dec 2025
Statutory expiry
12 Jan 2026
Env. assessment
No
Hinckley and Bosworth
Planning Authority Score
2.8/10
Poor
#238 of 296 overall
Relevant to this application:
Householder decisions

Hinckley and Bosworth is one of the slowest councils in England for householder decisions: #273 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hinckley and Bosworth decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #154 of 296
94%
Householder approved
Above avg (90%) #109 of 296
37%
Decided in 8 weeks
Below avg (63%) #273 of 296
56%
Extended time limit
Above avg (41%) #254 of 296
65%
Minor dwellings approved
46 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
86%
Change of use approved
21 decided
520
Total decisions
63 refused in the year to March 2026